Laserfiche WebLink
Page Number 2 <br /> Invoice Number 692 <br /> Project ECOR960007.00 <br /> Task: 005 Earth work <br /> FEE <br /> Total Fee 12,064.00 <br /> Percent Complete 0.00 Total Earned 0.00 <br /> Task Total 0.00 <br /> Task: 006 Surface Drainage-Rock Tunnel Discharge <br /> Task 6A PVC Pipe Installation <br /> FEE <br /> Total Fee 11,715.00 <br /> Percent Complete 98.16 Total Earned 11,500.00 <br /> Task Total 11 ,500.00 <br /> Task 6B Install Surface Channel <br /> FEE <br /> Total Fee 7,240.00 <br /> Percent Complete 0.00 Total Earned 0.00 <br /> Task Total 0.00 <br /> Task: 007 Surface Drainage-Contour Furrows <br /> FEE <br /> Total Fee 4,890.00 <br /> Percent Complete 0.00 Total Earned 0.00 <br /> Task Total 0.00 <br /> Task: 008 Equipment Rental <br /> Task 8A Bulldozer, w/operator <br /> FEE <br /> Total Fee 1 ,200.00 <br /> Percent Complete 0. 00 Total Earned 0.00 <br /> Task Total 0.00 <br /> Task 8B Backhoe Loader, w/operator <br /> FEE <br /> Total Fee 1 ,560.00 <br /> Percent Complete 0.00 Total Earned 0.00 <br /> Task Total 0.00 <br />