Laserfiche WebLink
UNIT PRICE SCHEDULE BACKUP <br /> OWNER: State of Colorado-Attn: Maggie Van Cleef FROM ERM EnviroClecn-Rocky Mountain,Inc APPLICATION NO 2 <br /> Division of Minerals&Geology 5950South Willow Drive APPLICATION DATE July 31, 1996 <br /> 1313 Sherman Street,Room 215 Suite 206 APPLICATION PERIOD* July, 1996 <br /> Denver,Colorado 80203 Greenwood Village,CO 80111 <br /> CONTRACT NO: PKA-6-372 PROJECT NO. ECOR960007.00 <br /> CONTRACT DATE: June 20.1996 <br /> SUBJECT: Coal Basin Rock Tunnel <br /> AAR AMOUNT <br /> PROJECT/TASK ESTIMATED UNIT CONTRACT %COMPLETE TOTAL PREVIOUSLY AMOUNT <br /> NUMBER ITEM DESCRIPTION UNIT QUANTITY PRICE AMOUNT TO DATE AMOUNT DUE INVOICED THIS INVOICE <br /> 3 <br /> Task Mobilization/Demobilization 1 N/A $6,580.00 85% $5,593.00 $3,35580 $2,23720 <br /> Task 2 Demolition 1 N/A $18,58000 90% $16,72200 $1,031 20 $15,69080 00 <br /> Task 3 Sift Fence 1 $0.94 $470.00 0% $000 $000 $0 co <br /> Task 4 Block Walls 1 N/A $4,350 00 50% $2,175 00 ~ <br /> $0 00 $2,175.00 t` a <br /> Tasks EaMWortc 1 N/A $12,06400 45% $5,42880 $000 $5,428.80 (p v j <br /> Task 6 Surface Drainage Rock Tunnel <br /> 6o PVC Pipe Installation 1 $71 00 $1 1,715 00 75% $8.786 25 $0 00 $8,786 25 *� ► `s a`p� <br /> 6b Install Surface Channel 1 $905 $7,24000 0% $000 $000 $0 co <br /> Task 7 Surface Drainage Contour Furrows 1 $4,890 00 0/.60% $2,934 00 $0.00 $2,934 001 %'9se -1 b <br /> Task 8 Equipment Rental <br /> 80 Bulldozer,w/operator, 1 $120.00 $1,200.00 0% $000 $000 $0.00 <br /> 8b Backhoe Loader,wloperator 1 $65.00 $1,56000 0% $0.00 $0.00 $0,00 <br /> 8c 5 cy on/off highway dump truck,w/operator 1 $55.00 $1,100 00 0% $0.00 $0.00 $000 <br /> Task Revegetation 1 $650.00 $4,550.00 0% $0.00 $0.00 $000 <br /> Soills amendment•Cow manure 1 $525.00/ $3,675.00 0% $0.00`� $0.00 $0.00 45) <br /> pGwYA-f- <br /> $41,639.05 <br /> FWWfl, MTOTAL LUMP SUM ITEMS $77,974.00 11IMMIEMI $41,639.05 $4,387 00 $37,252.05 <br /> p:\ec\r\colo-dmg\960007\IN VUNIT2XL5 <br /> Page 2 of <br />