UNIT PRICE SCHEDULE BACKUP
<br /> OWNER: State of Colorado-Attn: Maggie Van Cleat FROM: ERM EnviroClean-Rocky Mountain,Inc. APPLICATION NO: 2
<br /> Division of Minerals&Geology 5950 South Willow Drive APPLICATION DATE: July 31 1996
<br /> 1313 Sherman Street,Room 215 Suite 206 APPLICATION PERIOD: July,1996
<br /> Denver,Colorado 80203 Greenwood Village,CO 80111
<br /> CONTRACT NO: PKA-6-372 PROJECT NO: ECOR960007.00
<br /> CONTRACT DATE: June 20,1996
<br /> SUBJECT: Coal Basin Rock,Tunnel
<br /> AAR AMOUNT
<br /> PROJECT/TASK ESTIMATED UNIT CONTRACT %COMPLETE TOTAL PREVIOUSLY AMOUNT
<br /> NUMBER ITEM DESCRIPTION UNIT QUANTITY PRICE AMOUNT TO DATE AMOUNT DUE INVOICED THIS INVOICE
<br /> Task 1 Mobilization/Demobilization 1 N/A $6,580.00 85% $5,59300 $3,355.80 $2,237.20
<br /> Task 2 Demolition 1 N/A $18,580.00 90% $16,722.00 $1,031.20 $15,690.80
<br /> Task 3 Silt Fence 1 $0.94 $470 00 0% $0.00 $0.00 $0 00
<br /> Task Block Walls 1 N/A $4,350.00 50% $2,175.00 $0.00 $2,17500
<br /> Task 5 Earth Work 1 N/A $12,064,00 45% $5,428.80 $0.00 $5,428.80
<br /> Task 6 Surface Drainage Rock Tunnel
<br /> 6a PVC Pipe Installation 1 $71.00 $11,715,00 75% $8,786.25 $0.00 $8,786.25
<br /> 6b Install Surface Channel 1 $9.05 $7,24000 0% $0.00 $0.00 $0.00
<br /> Task 7 Surface Drainage Contour Furrows 1 $8.15 $4,890.00 60% $2,934.00 $0.00 $2,934.00
<br /> Task 8 Equipment Rental
<br /> 80 Bulldozer,w/operator 1 $120.00 $1,200.00 0% $0.00 $0.00 $0.00
<br /> 8b Backhoe Loader,w/operator 1 $65.00 $1,560,00 0% $0.00 $0.00 $0.00
<br /> 8c 5 cy onloff highway dump truck,w/operator 1 $55.00 $1,100,00 0% $0.00 $0,00 $0,00
<br /> Task 9 Revegetatlon 1 $650.00 $4,550.00 0% $0.00 $0.00 $0.00
<br /> Scills amendment-Cow manure 1 $525.00 $3,675.00 0% $0.00 $0.00 $0,00
<br /> $41,639 05
<br /> TOTAL LUMP SUM ITEMS $77,974.00 il' $41,639.05 $4,387.00 $37,252.05