My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-11-20_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-11-20_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2021 7:29:55 AM
Creation date
10/22/2012 10:28:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
11/20/1996
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENT' OY=ERM-ROCKY !MOUNTAIN 9- 6-96 ; 11:25 DENVER- 1 303 2410336;# 3/ 5 <br /> ERM EN VIROCLEAN-R6CKY MOUNTAIN,INC. <br /> 5950 S. Willow Drive, Suite 206 <br /> Greenwood Village, CO 8011 I <br /> (303)694-7390 <br /> September 6, 1996 <br /> State of Colorado <br /> Attn: Jim McArdle Project ECOR960007.00 <br /> Division of Minerals&Geology <br /> 1313 Sherman Street,Room 215 <br /> Denver, CO 80203 <br /> Invcric a Kir: Coal Basin Rock Tunnel <br /> Rodstone, Colorado ERM <br /> Contract No_: PKA-6-372 <br /> Unit % Complete Invoice <br /> Task Price To Date Amount <br /> Task I Mobilization/Demobilization $6,580.00 66.66°/a $4,38623 <br /> Task 2 Demolition $18,500.00 100.W/o $18,500.00 <br /> Task 3 Silt Fence $0.94 0.00% $0.00 <br /> Task 4 Block Walls $4,350.00 100.000/0 $4,350.00 <br /> Task 5 Earth Work $12,064.00 100.000/0 $12,064.00 <br /> Task 6 Surface Drainage: Rock Tunnel <br /> 6a PVC Pipe Installation $11,715,00 100.000/0 $11,715.00 <br /> 6b Install Surface Channel $9.05 Lr 600 $5,430.00 <br /> Task 7 Surface Drainage: Contour Furrows $4,890.00 0.000/0 WOO <br /> Task 8 Equipment Rental <br /> 8a Bulldozer, w/operator $1,200.00 0.00�fa $0.00 <br /> 8b Baokhoe Loader, w/operator $1,560.00 0.00a/0 $0.00 <br /> 8c 5 cy ontoff highway clump truck,w/open $1.100-00 0,000/0 $0.00 <br /> Task 9 Revegetation $4,550.00 0.000/a $0.00 <br /> Total Invoice $%,445.23 <br /> p:leclrla>10-dmgt900071rty-inv.xls <br /> aayaee w�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.