My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-11-20_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-11-20_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2021 7:29:55 AM
Creation date
10/22/2012 10:28:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
11/20/1996
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERM ENVIROCLEAN-ROCKY MOUNTAIN, INC. + <br /> 5950 S. Willow Drive, Suite 206 <br /> Greenwood Village, CO 80111 <br /> (303) 694-7390 <br /> October 24, 1996 <br /> State of Colorado '� (� Invoice 745 <br /> Attn: Jim McArdle Project ECOR960007.00 <br /> Division of Minerals& Geology <br /> 1313 Sherman Street, Room 215 j��� 0-� , <br /> i <br /> Denver, CO 80203 <br /> Invoice for: Coal Basin Rock Tunnel <br /> Redstone, Colorado <br /> Contract No.: PKA-6-372 ERM <br /> Unit %Complete Previously Invoice <br /> Task Price To Date Billed Amount <br /> Task 1 Mobilization/Demobilization $6,580.00 100.00% $4,386.23 $2,193.77 <br /> Task 2 Demolition $18,580.00 100.00% 18,500.00 80.00 <br /> Task 3 Silt Fence-None Used $0.94 0.00% 0.00 0.00 <br /> Task 4 Block Walls $4,350.00 100.00% 4,350.00 0.00 <br /> Task 5 Earth Work $12,064.00 100.00% 12,064.00 0.00 <br /> Task 6 Surface Drainage:Rock Tunnel <br /> 6a PVC Pipe Installation $11,715.00 100.00% 11,715.00 0.00 <br /> 6b Install Surface Channel $9.05 LF 800 5,430.00 1,810.00 <br /> Task 7 Surface Drainage: Contour Furrows-None 1 $4,890.00 0.00% 0.00 0.00 <br /> Task 8 Equipment Rental <br /> 8a Bulldozer,w/operato (3 hrs) $1,200.00 0.00% 0.00 0.00 <br /> 8b Backhoe Loader,w/operator-None used $1,560.00 100.00% 0.00 195.00 <br /> 8c 5 cy on/off highway dump truck,w/operator $1,100.00 0.00% 0.00 0.00 <br /> Task 9 Revegetation $4,550.00 100.00% 0.00 4,550.00 <br /> Change Order#2-Added manure-7 acres $3,675.00 100.00% 2,100.b0 1,575.00 <br /> Previously billed 4 acres <br /> Total Invoice $58,545.23 $10,403.77 <br /> p:\m-\r\wkrdmg\90007\rev-inv.xls <br /> Raveled Pooh 0-.f y <br />
The URL can be used to link to this page
Your browser does not support the video tag.