Laserfiche WebLink
BULLDOZER WORK <br />Task description: Grade staging area and WRDA <br />Site: Equity Exploration Project Permit Action: MD -2 <br />PROJECT IDENTIFICATION <br />Task #: 203 State: Colorado <br />Date: 10/18/2012 County: Mineral <br />User: RCO <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />_ <br />CRG <br />Cost Breakdown: <br />Page 1 of 2 <br />Permit/Job#: P2011010 <br />Abbreviation: None <br />Filename: P010-203 <br />Total unit Cost/Hour: $261.50 <br />Total Fleet Cost/Hour: $261.50 <br />MATERIAL QUANTITIES <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$81.85 <br />NA <br />Operating Cost/Hour: <br />$140.68 <br />100 <br />Ripper op. Cost/Hour: <br />$0.48 <br />5 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $261.50 <br />Total Fleet Cost/Hour: $261.50 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />3,630 <br />Swell factor: <br />1.000 <br />Loose volume: <br />3,630 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Rock, avg. ripped or blasted 0.7 <br />Average push gradient: -10% <br />Average site altitude: 11,120 feet <br />Material weight: <br />Weight description: <br />800 ibs/LCY <br />Granite - Broken <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />AVG. <br />Material consistency: 0.700 <br />CAT HB <br />Dozing method: 1.000 <br />GEN. <br />CaCES Cost Estimating Software <br />