My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-19_REVISION - P2011010
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2011010
>
2012-10-19_REVISION - P2011010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:35:01 AM
Creation date
10/22/2012 9:19:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011010
IBM Index Class Name
Revision
Doc Date
10/19/2012
Doc Name
Modification Approved, Notice of Bond Increase
From
DRMS
To
Rio Grande Silver
Type & Sequence
MD2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION WORK <br />Task description: Additional demo and debris removal <br />Site: Equity Ez loration Project <br />PROJECT IDENTIFICATION <br />Permit Action: MD -2 <br />Task #: 201 State: Colorado <br />Date: 10/18/2012 County: Mineral <br />User: RCO <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Permit/rob#: P2011010 <br />Abbreviation: None <br />Filenarne: P010-201 <br />Location adjustment: 99.50 % <br />Structure or Item <br />Dimensions <br />Demolition Menu <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Description <br />Selection <br />Cost <br />Haul mise wood/metal <br />Assume 20 cy <br />Loading and 5 mile haul, <br />20.00 <br />CY <br />$8.78 <br />$175.60 <br />debris <br />salvage allowed - Steel <br />frame structures <br />Demo and remove <br />Approx 10 cy <br />Loading and 2 mile haul, <br />10.00 <br />CY <br />$33.55 <br />$335.50 <br />fuel facility <br />no salvage - Hand <br />loading <br />Demo and haul barrel <br />Assume 10 cy <br />Loading and 2 mile haul, <br />10.00 <br />CY <br />$33.55 <br />$335.50 <br />test materials <br />no salvage - Hand <br />loading <br />Place debris <br />Assume 20 cy <br />Push demolished <br />20.00 <br />CY <br />$0.69 <br />$13.74 <br />underground <br />materials/rubble/debris <br />into pit - Max. 200 ft. <br />push <br />Job Hours: 10.00 <br />Subtotal <br />(unadjusted): $860.34 <br />Notes: Includes items not already part of bonded disturbance. <br />Non -contaminants and non-metals may be disposed of underground. <br />Total Cost <br />(adjusted for <br />location): $856.04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.