Laserfiche WebLink
Exhibit U <br />Environmental Protection Plan <br />JD -9 Mine Permit Amendment <br />M -1977 -306 <br />Table of Contents <br />(1) Introduction 4 <br />(2) Maps 5 <br />(3) Identification of Other Agencies' Environmental Protection Measures and Monitoring <br />Requirements 5 <br />(4) Other Permits and Licenses 6 <br />(5) Designated Chemical Evaluation 7 <br />(6) Designated Chemical and Material Handling 8 <br />6.1 Types of Acid and Toxic Producing Materials Originating Onsite 8 <br />6.1.1 Source 8 <br />6.1.2 Quantity 9 <br />6.1.3 Prevention of Adverse Offsite Impacts 9 <br />(7) Facilities Evaluation 10 <br />7.1 Containment Measures 10 <br />7.2 Environmental Protection Evaluation 10 <br />7.2.1 Radiometric Survey 10 <br />(8) Groundwater Information 10 <br />8.1 Area Geology 11 <br />8.2 Mineralization 12 <br />8.3 Regional Groundwater 12 <br />8.3.1 Area Aquifers 12 <br />8.3.2 Hydrostratigraphic Structure 14 <br />8.3.3 Hydraulic Parameters 14 <br />8.3.4 Recharge 16 <br />8.4 Groundwater Monitoring 17 <br />8.5 Geochemistry of Uranium Deposits 18 <br />8.6 Mobilization of Uranium Related Constituents 18 <br />8.7 Proposed Groundwater Monitoring Plan 20 <br />(9) Groundwater Quality Data 20 <br />(10) Surface Water Control and Containment Facilities Information 22 <br />(11) Surface Water Quality Data 22 <br />(12) Water Quality Monitoring Plan 22 <br />(13) Climate 22 <br />13.1 Temperature 22 <br />13.2 Wind Speed 23 <br />(14) Geochemical Data and Analysis 23 <br />14.1 Results of SPLP Tests 23 <br />14.2 Mobility of Detected Uranium Ore Related Constituents 25 <br />14.3 Acid Mine Drainage Potential 26 <br />(15) Construction Schedule Information 26 <br />O'Connor Design Group Inc. U - 1 <br />