(For a list of acreages associated with each surface disturbance see Exhibit D - Mining <br />Plan) <br />The affected area is so small that partial reclamation efforts prior to permanent closure of <br />the mine are not practical; therefore reclamation will not begin until mining operations <br />have permanently ceased. It is estimated that there are enough reserves to continuously <br />mine SR -13A for up to 15 years. Once reclamation begins, it should be completed within <br />5 years. The dirt work, including backfilling, grading, sealing portal and vents and <br />reseeding, will take approximately 6 -12 months. Re- vegetation is expected to be <br />complete after 2 -3 years. <br />A. Mine Portals <br />The northern portal will have the existing bat gate re- installed. The southern <br />portal will use the same bat gate that is currently in place. <br />B. Parking Area <br />This area was not stripped and will only need to be ripped and reseeded. <br />C. Mining Buildings <br />All buildings will be dismantled and hauled off site and the foundations of any <br />permanent buildings will be broken up and placed in the portal prior to backfilling <br />the portal. The soil beneath the buildings will then be ripped and seeded. <br />D. Haulage Ramps <br />Haulage ramps will be ripped and seeded. <br />E. Ventilation Shafts <br />At the vent holes, all surface structures will be removed. The cement pad will be <br />broken up and placed into the shaft. Then the shaft will be plugged using either <br />polyurethane foam with a thickness of 10 feet, or concrete with a thickness of 3 <br />feet, placed far enough down the hole that a minimum of several feet of mine <br />waste and one foot of soil cover can be placed on top of this plug. This cover <br />material will be slightly mounded so that after natural compaction, there will not <br />be a depression remaining to collect any surface water. This area will then be <br />scarified and seeded. <br />F. Berms and Ponds <br />All rainwater containment structures will be left in place in order to divert surface <br />runoff from contact with potential constituents associated with the waste rock and <br />ore pad. All runoff basins will be seeded; ditches will not. <br />G. Waste Rock Pile <br />The waste pile will be graded to mimic the existing topography using a D -6 dozer <br />or equivalent. The terraces will be re- sloped to reflect the original topography <br />and will be no steeper than 2H:1 V on the surface. Once the re- contouring is <br />completed, the area will be covered with available soil salvaged from the toe of <br />D -2 <br />