Laserfiche WebLink
Exhibit F <br />Reclamation Map <br />JD -7 Mine Permit Amendment <br />M- 1979 -094HR <br />Backfilling and reclamation of the open pit will occur throughout the life of the mine. <br />The slopes of the mine waste pile will be re- contoured to the final 4:1 slope on an annual <br />basis as the waste pile reaches the ultimate planned extent as shown in the attached <br />Exhibit F Reclamation Plan Map. The Phase 1 and 2 areas of the open pit will be <br />backfilled using overburden removed from the upper Phase 3 and 4 areas of the open pit. <br />The contours of the site following final grading and re- vegetation are depicted in Exhibit <br />F Reclamation Plan Map. <br />