Laserfiche WebLink
Rock Tunnel Vicinity Project (additional demolition, culvert removal, highwall backfill, <br /> reve etation) <br /> TASK DESCRIPTION QTY. UNIT UNIT PRICE AMOUNT <br /> 1 Mob/Demob ' 1 Job N/A $9,550 <br /> 2 Demolition, <br /> Concrete <br /> a Lamp House 2 489 Cubic Yards $20.20 $9,878 <br /> b Pump House 2 Cubic Yards $20.20 $40 <br /> c Water Tank 3 24 Cubic Yards $20.20 $485 <br /> 3 Demolition, <br /> Steel,Misc. " <br /> a Water Tank 1 Job N/A $562 <br /> b Lamp House <br /> Roof 1 Job N/A $5,854 <br /> c Belt Line,016 <br /> Access Road 1 Job N/A $100 <br /> 4 Culvert Removal <br /> 4 <br /> a Road E 1 Each $774 $744 <br /> b Rock Dump Rd. 1 Each $774 $744 <br /> 5 Earth Work <br /> Backfill <br /> a Highwall 579 Cubic Yards $2.21 $1,280 <br /> 6 Construct <br /> Drainages <br /> a Rock Tunnel 6 700 Feet $19.00 $13,300 <br /> b Rock Dump 5 350 Feet $2.65 $928 <br /> 7 Road Work, <br /> Tank Road <br /> a Grading 9 450 Feet $0.74 $333 <br /> Rolled Dip <br /> b Construction 2 Each $72.67 $145 <br /> Low Water <br /> Crossinu,Rock <br /> 8 Dump, Road E 2 Each $1,133.33 $2,267 <br /> 9 Revegetation <br /> a Slopes<3:1 2.0 Acre $1,097.78 $2,196 <br />