My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (177)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (177)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 8:37:29 AM
Creation date
10/19/2012 10:20:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources PFUT'W, <br /> 1 31 3 Sherman St, Room 215 <br /> Denver,Colorado 80203 <br /> Phone (303)866-3567 <br /> FAX (301)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br /> Roy Romer <br /> Governor <br /> James S Lochhead <br /> February 3, 1998 Executive Director <br /> Michael B Long <br /> Division Director <br /> MEMO <br /> TO: Cheryl Linden, David Bucknam <br /> FROM: Steve Renne _---- <br /> RE: Revised Coal Basin Cost Estimate <br /> I have noted three errors in the January 21, 1998 Reclamation Cost Estimate for the Coal Basin <br /> Mine. <br /> The amount of acreage remaining to be reclaimed was tabulated incorrectly. This incorrect <br /> tabulation impacted the amount of seed required to complete reclamation. The overall cost of <br /> accomplishing reclamation changed as a result of this correction. <br /> Attached is a revised Seed Bid estimate, and a revised Reclamation Cost Estimate Summary. <br /> These revisions reflect the corrected acreage and resultant cost changes. <br /> Regarding demolition at the Load Out facility, it was incorrectly noted that the steel demolition <br /> cost was determined using the cost estimating program. The estimate was made after on-site <br /> observation of the amount of equipment, scrap and structures which remained at the site in late <br /> fall, 1997. <br />
The URL can be used to link to this page
Your browser does not support the video tag.