Laserfiche WebLink
JAN. 23.199Ef 2:40PM CITY OF ASPEN NO.805 P.23 <br />PERCOLATION TEST FIELD SHEET <br />COMPLETE IN DUPLICATE <br />(Check person responsible for or performing tests) <br />(V/) NAME OF OWNER AN CON 1. rOKjs rn <br />ADDRESS --Cfifto fj AL gl- COLOR1W a PHONE VJ2.3 24549 <br />9 <br />NAME OF CONTRACTOR OR EXCAVATOR <br />JL <br />ADDRESS <br />1jW AL PHONE <br />LEGAL DESCRIPTION OF PROPERTY <br />In IAL6 <br />A 17-is'l AJ -CQ Q 81-r- N( COL-0 Ig py 0 <br />General information & Instructions. <br />In addition to compliance with all other rules and regula- <br />tions for sewage systems aS promulgated by the County of Pitkin <br />and State of Colorado, it shall be the responsibility of every <br />property owner/installer/contractor/excavator (the person running <br />the tests) installing a sewage system to conduct percolation tests <br />*n accordance with the specifications hereinafter set forth. <br />Subsequent to the performance of the required test, it <br />will be nedessary for the person responsible for/or person perform- <br />ing the tests to-.fIle, complete and under oath and penalty of <br />perjury, the affidavit form contained on the reverse hereof. <br />Warning is hereby given that spot' checks and inspections will be <br />performed by the Pitkin County Pollution Control Officer and his <br />authorized agents with or without the knowledge of_ pqr�-on...-ple-r-f-orpl:n- <br />i - ng or responsible . . for the tests to - i . nsure co - mpli . ance with the <br />requiements hereof. <br />Soaking is to be performed in the 24-hour period between <br />and I.M. on the Zo and 2-1 days of <br />A e actual percolation T-e-sfs- are to be <br />7e—r, f 6 r"fn e d at and 1,ZAC p . M. on -IVO 1- / -77.3, <br />, i t ffa - � — I - <br />At least two (2) test holes per system must be run. They <br />should be in the area (within Q feet) of the proposed leach- <br />ing system and dug to the depth or the proposed system, generally <br />2.5 to 3 feet deep and 12 to 16 inches in diameter. <br />The holes are to be soaked for a 24 -hour period prior to <br />running the test. <br />