Laserfiche WebLink
02/18/94 11:09 V505 7662609 OSM ALBUA FO 013 <br /> FACELITIES AREA: OSM DMG <br /> Main Office and <br /> Rock Tunnel <br /> Quantity Cost Unit Cost Quantity Cost Unit Cost <br /> 1. Building Demolition 65,790. <br /> (Rock Tunnel) <br /> - 168,407. <br /> 2. Building Demolition 194,693. <br /> (Main Office) - 383,082. <br /> 3. Prep. Plant Demolition 177,488. 538,641. <br /> (Main Office) - 627,615. <br /> 4. Power lines & poles - 165,000. <br /> 5. Light Use Road; (Ft) 17,700. 177,000. 10.00 <br /> 6. Revegetation (ac) <br /> (a) Main Office 32. 29,600. 925. <br /> (b) Powerlines, Ponds 129.7 ]20,000. 925. <br /> Conveyors <br /> (c) Exploration Drill Road 3.7 16,146 4,364. <br /> 7_ Reconstruct Dutch Creek <br /> (yds3) <br /> (a) Excavation 75,000. 196,500. 2.62 <br /> (b) Riprap 7,500 735,000. 98.00 <br /> 8. Dutch Creek Stabilization <br /> (ydiO) <br /> (a) Construct Diversion <br /> 1. Excavation 11,111. 29,111. 26.20 <br /> 2. Riprap 1,667. 185,000. 110.98 <br /> (b) Rock Buttress of Cut <br /> bank 741. 72,593. 97.97 <br /> 9. Dutch Creek Flume <br /> removal <br /> (a) Demolition 5,667, <br /> (b) Fill and regrade 741. 1,096_ 1.48 <br /> Channel (yds3) <br /> 10. Reclaim Sediment <br /> Ponds 82,152. 14b,231. 1.78 2,162. 28,1334. 13.01 <br /> (38) (yds') <br /> 11. Rock Tunnel Facilities <br /> Diversion (ydc3) <br /> (a) Excavation 463. 1,736. 3.75 <br /> (b) Riprap 69. 9,028 130.84 <br /> Summary 3,068,812. <br />