Laserfiche WebLink
Task Description Bids Analyzed Unit Prices Average Price per <br /> Unit <br /> 5 Yard Truck Warehouse $35.00, $57.00 <br /> 45.00 $45.67/Hr. <br /> Contour Furrow Mines 1 and 2, Mine $1.00, $3.83 $3.00 <br /> construction 3, Mine 4 5.00 3.41 2.00 <br /> 2.50 1.00 1.50 $2.58/Ft. <br /> Excavate, Load, Sutey n $27,970, $30,000 $3.26/ Yd.3 <br /> Haul, Grade <br /> Dirt/Soil long uphill <br /> haul <br /> Excavate, Load, Rock Dump B <br /> Haul, Dirt/Soil <br /> excavate semi- $60,000, $51,980 $1.81/Yd. s <br /> consolidated road <br /> outslope, 1/2 mi. <br /> downhill haul <br /> Excavate, Load, Rock Dump C <br /> Haul, Grade <br /> Dirt/Soil excavate $60,000, $51,980 $2.12/Yd. 3 <br /> semi-consolidated <br /> road outslope, 1/2 mi. <br /> downhill haul, grade <br /> and spread <br /> Excavate, Load, Warehouse $2.00, $2.28 <br /> Haul, Stockpile 2.35 <br /> Dirt/Soil move soil $2.21/Yd. 3 <br /> from stockpile <br /> downhill 1/3 mi. and <br /> re-stockpile <br /> Soil Amendment 3 Rock Dump $300, $545 <br /> tons hay per acre, 850 <br /> incorporated $565.00/Ac. <br /> Demolition and Warehouse $40,000, $27,000 <br /> Disposal of 41,250 $13.30/ Yd. 3 <br /> Concrete D (2,713 yd 'est.) <br /> 4 <br />