Laserfiche WebLink
Task Description Bids Analyzed Unit Prices Average Price per <br /> Unit <br /> Mob/Demob on Warehouse, Sutey, $6,985, $10,000 <br /> larger jobs using Roads, Mines11/2, 10,900, 10,000 <br /> varied equipment; Mine 3, Rock Dump 25,600, 11,000 <br /> greater amounts of 8,500, 11,000 $13,310/Job <br /> equipment; or heavier 15,000, 10,000 <br /> equipment 7,000, 10,000 <br /> 35,075, 12,000 <br /> 19,642 10,560 <br /> 13,000 <br /> Mob/Demob on Rock Tunnel, Mine 4 $6,580, $5,000 <br /> smaller jobs using $5,790/Job <br /> less equipment, or <br /> lighter equipment <br /> Lined Ditches 4'xl.2' Sutey $5.60, $4.00 $4.80/Ft. <br /> Lined V Channels $3.30, $2.00 $2.65/Ft. <br /> smaller 1'x 4' (2:1) Sutey <br /> Double Lined Warehouse $27.70, $18.30 <br /> Channel medium 10.00 $18.70/Ft. <br /> trapezoid 2'x2' <br /> Lined Stream Sutey $7.65, $6.00 <br /> Channel larger $6.83/Ft. <br /> trapezoid 7'x2' <br /> Unlined Stream Warehouse $2.00, $2.00 <br /> Channel medium 1.40, 1.80 $2.20/ Ft. <br /> trapezoid 2'x2' 3.00, 3.00 <br /> Unlined V Channel Sutey $2.00, $2.00 $2.33/Ft. <br /> smaller Fx4' (2:1) 3.00 <br /> Rip Rap Lined Warehouse $20.00, $27.00 <br /> Channel medium 10.00 $19.00/Ft. <br /> trapezoid 2'x2' <br /> Road Dirt Work Roads 8.4 miles @ $41,333 <br /> = $4,921 per mile = $0.93/Ft. <br /> $0.93 per foot ' <br /> 2 <br />