Task Description Bids Analyzed Unit Prices Average Price per
<br /> Unit
<br /> Mob/Demob on Warehouse, Sutey, $6,985, $10,000
<br /> larger jobs using Roads, Mines11/2, 10,900, 10,000
<br /> varied equipment; Mine 3, Rock Dump 25,600, 11,000
<br /> greater amounts of 8,500, 11,000 $13,310/Job
<br /> equipment; or heavier 15,000, 10,000
<br /> equipment 7,000, 10,000
<br /> 35,075, 12,000
<br /> 19,642 10,560
<br /> 13,000
<br /> Mob/Demob on Rock Tunnel, Mine 4 $6,580, $5,000
<br /> smaller jobs using $5,790/Job
<br /> less equipment, or
<br /> lighter equipment
<br /> Lined Ditches 4'xl.2' Sutey $5.60, $4.00 $4.80/Ft.
<br /> Lined V Channels $3.30, $2.00 $2.65/Ft.
<br /> smaller 1'x 4' (2:1) Sutey
<br /> Double Lined Warehouse $27.70, $18.30
<br /> Channel medium 10.00 $18.70/Ft.
<br /> trapezoid 2'x2'
<br /> Lined Stream Sutey $7.65, $6.00
<br /> Channel larger $6.83/Ft.
<br /> trapezoid 7'x2'
<br /> Unlined Stream Warehouse $2.00, $2.00
<br /> Channel medium 1.40, 1.80 $2.20/ Ft.
<br /> trapezoid 2'x2' 3.00, 3.00
<br /> Unlined V Channel Sutey $2.00, $2.00 $2.33/Ft.
<br /> smaller Fx4' (2:1) 3.00
<br /> Rip Rap Lined Warehouse $20.00, $27.00
<br /> Channel medium 10.00 $19.00/Ft.
<br /> trapezoid 2'x2'
<br /> Road Dirt Work Roads 8.4 miles @ $41,333
<br /> = $4,921 per mile = $0.93/Ft.
<br /> $0.93 per foot '
<br /> 2
<br />
|