Laserfiche WebLink
Task 242 - Road maintenance after reclamation $17,154.00 <br /> Assume 10 years, 20 hours/year of 14G time @ $88.77/hr <br /> Task 243 - Dredge ponds during vegetation establishment $192,000.00 <br /> Assume 12 ponds will be dredged twice during first three years. 34 dredgings at $8000.00 each. <br /> Ponds to be dredged are the Rock Tunnel Ponds A,B, D, and E;upper Rock Tunnel pond; Old Refuse <br /> Area pond; Prep. Plant ponds A, B, C, and D; and the Sutey A and B ponds. <br /> Cost to dredge ponds is $8,000.00, using a Caterpillar E120B excavator, three haul trucks, and a <br /> Caterpillar D3 dozer. 24 X $8,000.00 = $192,000.00 <br /> Task 245 - DMG Project Administration Costs $242,762.00 <br /> DMG costs for project administration over three years are estimated at $242,762.00. This includes <br /> personnel costs at $226,226.00, per diem at $12,600.00, and mileage at $3,936.00. <br /> Task 263 - Job Superintendent $190,978.00 <br /> Total job time is estimated at 6,850 hours, based on twelve separate projects. The projects are as <br /> follows: <br /> 1. Sutey Refuse pile, Rock Tunnel pile, Old Refuse Area <br /> 2. #5 Fan, #5 fan road, Mine #5, Road G hydrologic work <br /> 3. Mine #3, #3 fan, #3 fan road, Road F hydrologic work <br /> 4. Mines #1 and #2, #1 and #2 fans, #1 and #2 fan roads, #1/#2 coal storage bench, Road D <br /> hydrologic work <br /> 5. Mine #4, lower bench area of Mine #4, Road C hydrologic work <br /> 6. Roads C, D, E, F, and G <br /> 7. Rock Tunnel <br /> 8. Shop/prep. plant area <br /> 9. Pond removal and Dutch Creek reconstruction <br /> 10. Roads A and B reclamation and hydrologic work <br /> 11. Carbondale Loadout <br /> 12. Maintenance <br /> The hourly cost for the job superintendent and transportation is $27.88. The superintendent would be <br /> on site for the entire project duration. 6,850 X $27.88 = $190,978.00. <br />