Laserfiche WebLink
Sheet 1 of 3 <br /> Colorado Division of Minerals and Geology <br /> ESTIMATING FORM - TRUCK/LOADER TEAMS <br /> ------------------------------------ <br /> ------------------------------------ <br /> Task No. 251 Prep. By: SLB Permit No. C-81-017 <br /> Date 03/17/95 Filename: C017-251 Operation: Coal Basin Mines <br /> Permit Action N/A <br /> ------------------------------------------------------ <br /> Task Description Distribute topsoil on Mine #1/#2 benches <br /> ----------------------------------------------------- <br /> HOURLY EQUIPMENT COSTS: <br /> Single, Double or Triple <br /> County: PITKIN Labor Zone 2 Shifts S <br /> Equipment Descriptions <br /> Truck/load team - Truck :Generic 18t, 12.0-18.Ocy, 350hp 6x4 d. on/off-hw <br /> - Loader :CAT 966E <br /> Support equip. - Load area:CAT D4E with straight blade & 3-shank ripper <br /> - Dump area:CAT D8L with straight blade <br /> Road maint. - Grader :N/A <br /> - Water T. :N/A <br /> --------------.----.------------------------_-.-.----- <br /> Truck/Load Team Support Equipment Road Maintenance <br /> Truck Loader Load area Dump area Grader Water T. <br /> Equipment FiLename:18CYHLTK 966ELODR D4E-S3RP D8L-SDZR N/A N/A <br /> -------- -------- -------- -------- --------- -------- <br /> Utilization on job <br /> -Machine: 100% 50% 100% 25% N/A N/A <br /> -Ripper : N/A N/A 50% N/A N/A N/A <br /> -------- -------- -------- -------- --------- -------- <br /> Cost Breakdown <br /> ownership cost/hr: $23.03 $29.29 $12.97 $42.79 N/A N/A <br /> operating cost/hr: $21.13 $10.52 $12.01 $11.46 N/A N/A <br /> Ripper Op. cost/hr: $0.00 $0.00 $0.54 $0.00 N/A N/A <br /> Operator cost/hr: $21.40 $20.38 $20.89 $20.89 N/A N/A <br /> -------- -------- -------- -------- --------- -------- <br /> Unit subtotals $65.56 560.20 E46.41 $75.14 N/A N/A <br /> -------- -------- -------- -------- --------- -------- <br /> # of eqp. units 4 1 1 1 0 0 <br /> ---- ---- ---- ---- ---- ---- <br /> Group subtotals- T/L team: $322.43 Support: $121.54 Rd. Maint.: $0.00 <br /> --------- --------- -------- <br /> Total Work Team Cost/Hr : $443.97 <br /> MATERIAL QUANTITIES: <br /> ------------------- <br /> ------------------- <br /> Beg. <br /> Volume: 6,792 BCY <br /> Cu.Yd. ---------- Swell Loose <br /> Volume: 6,792 BCY Factor: 1.150 Volume: 7,811 LCY <br /> Source of quantity take-off:Same volume as Tasks 170, 171, and 174, 12" depth <br /> ------------------------------------------ <br /> Source of est. swell factor:Caterpillar Handbook <br /> ------------------------------------------ <br />