My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (185)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (185)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 8:51:30 AM
Creation date
10/19/2012 10:20:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br /> ESTIMATING FORM - BULLDOZER WORK <br /> Task #: 176 Prep. by: SLB Task File Name: C017-176 <br /> ----1Z----94 Permit #:C-81-.Date: 017 Mine: Coal Basin Mines- -- <br /> .� ,� ---- --------- --------------------------------- <br /> Permit Action: N/A <br /> Task Description: Grade foundation rubble for prep. plant area fill <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8L Horsepower: 335 <br /> Blade Type: Straight ---------- <br /> Attachment #1: ROPS Cab Shift Basis: 1/day <br /> Attachment #2: N/A ---------- <br /> Cost Breakdown: <br /> -------------- Utilization % (code MO) <br /> Ownership cost/hr = $47.15 N/A <br /> Operating & overhaul cost/hr- dozer = $46.11 100 <br /> -ripper = $0.00 N/A <br /> Operator cost/hr = $21.58 N/A <br /> Total eqpt. unit cost/hr = $114.83 Total fleet cost/hr: $114.83 <br /> -------- -------- <br /> MATERIAL QUANTITIES <br /> ------------------- <br /> ------------------- <br /> Initial Swell Loose <br /> Volume: 50,500.0 LCY Factor: N/A Volume: 50,500.0 LCY <br /> ------------ --------- ------------- <br /> Source of quantity take-off: Appendix V-E-3 <br /> Source of est. swell factor: N/A <br /> --------------------------------------------------- <br /> HOURLY PRODUCTION <br /> Job Condition Correction Factors <br /> Avg. push distance: 150 ft. -------------------------------- <br /> --------- Operator.......... 0.75 (avg.) <br /> Unadjusted hourly Mat. consistency.. 0.70 (Cat tbl) <br /> dozer production: 692 LCY/hr Dozing method..... 1.00 (gen.) <br /> --------- Visibility........ 1.00 (avg.) <br /> Material consistency: Job efficiency.... 0.83 (1sh/day) <br /> Rock, avg. ripped or blasted Transmission type. 1.00 ( PS ) <br /> ---------------------------------- Grade adjustment.. 1.00 (Cat tbl) <br /> Avg. push gradient: 0.00 % (pos) Altitude adj. .... 0.95 (Cat tbl) <br /> --------- Material weight... 1.15 (user) <br /> Avg. site altitude: 8100 ft. Blade type........ 1.00 (S or U) <br /> --------- -------------------------------- <br /> Material weight 2000.00 lb/LCY Net Job Correction : 0.48 <br /> Mat. Descr.: --------- ----------- <br /> USER-PROVIDED WEIGHT DATA Adjusted Unit Prod.: 329.15 LCY/hr <br /> Adjusted Fleet Production: 329.15 LCY/hr <br /> JOB COST ----------- <br /> Fleet size 1 Dozer(s) Total Job Time: 153.43 Hours <br /> -------- ----------- <br /> Unit Cost $0.349 /LCY Total Job Cost: $17,618.05 <br /> -------- ----------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.