Laserfiche WebLink
Colorado Division of Minerals and Geology <br /> ESTIMATING FORM - BULLDOZER RIPPING <br /> ----------------------------------- <br /> ----------------------------------- <br /> Task #: 170 Prep. by: SLB Task File Name: C017-170 <br /> Date: -M_✓u_ /94 Permit #: C-81-017 Mine: Coal Basin Mines --+-- <br /> ��my ..-._-__----------_-_. <br /> Ali Permit Action: N/A <br /> --------------------------------------------------- <br /> Task Description: Rip remnants of Mine 1 bench <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D81. Horsepower: 335 <br /> Blade Type: Semi-Universal ---------- <br /> Attachment #1: ROPS Cab Shift Basis: 1/day <br /> Attachment #2: 3-shank ripper <br /> Cost/Hr Breakdown: Utilization % (code 6§0) <br /> ------- ----- ownership = $51.87 N/A <br /> operating/overhaul - dozer = $43.64 100 <br /> -ripper = S4.54 100 <br /> operator = $21.58 N/A <br /> Total egpt. unit cost/hr = $121.62 Total fleet cost/hr: $121.62 <br /> MATERIAL QUANTITIES <br /> Selected method Area <br /> Seismic Load Bank ------------- <br /> method: N/A N/A Factor : N/A Volume N/A BCY <br /> Area --___--_--- ------- ----------- <br /> method: 2.40 Acres Rip Depth: 3.00 Volume 11,616 BCY or CCY <br /> Source of quantity take-off: 1I-B-App.7-Att.1, and 1-Mine X-Section <br /> -_---____-.,,.----------------------------------------- <br /> Source of mat. Load factor: N/A <br /> HOURLY PRODUCTION <br /> ----------------- <br /> ----------------- <br /> Seismic Method - Seismic velocity of material: N/A feet/sec. <br /> -------------- - Unadjusted hourly production: N/A BCY or CCY/hr <br /> Area Method - Avg. ripping depth per pass: 2.69 feet <br /> ----------- - Avg. ripping width per pass: 6.25 feet <br /> - Avg. ripping length per pass: 100.00 feet <br /> - Avg. velocity of machine 88.00 feet/min. <br /> - Avg. machine maneuver time : 0.25 minutes <br /> - Hourly prod. per unit area . 0.621 acres/hr <br /> - Unadjusted hourly production: 2,694.90 BCY or CCY/hr <br /> Correction Factors - Unadjusted production = 2,694.90 BCY or CCY/hr <br /> - Site attitude = 10,000 feet <br /> - Altitude adjustment = 0.95 (Cat tbl) <br /> - Job efficiency factor = 0.83 (1sh/day) <br /> - Net correction = 0.79 multiplier <br /> - Adjusted production = 2124.93 BCY or CCY/hr <br /> - Fleet production = 2124.93 BCY or CCY/hr <br /> JOB COST <br /> Fleet Size 1 Dozer(s) Total Job Time: 5.47 Hours <br /> Unit Cost $0.057 /LCY Total Job Cost: $664.86 <br /> -------- ----- __--_ <br />