My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (185)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (185)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 8:51:30 AM
Creation date
10/19/2012 10:20:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br /> ESTIMATING FORM - SEALING BOREHOLES <br /> AAAAAAAnnnnnnnnnnnnnnnnAAAAnAnnnA^AAAAAAn <br /> Task #: 153 Prep, by: SLB Task Filename : C017-153 <br /> Date: 20-Mar-95 Permit #:C-81-017 Mine: Coal Basin Mines <br /> Permit Action: N/A <br /> Task Description: Seal and Plug Piezometers <br /> UNIT COSTS <br /> Drill Water Flatbed Pickup Dozer <br /> Mobile Equipment: Rig Truck Truck Truck (Cat D7H) Last update: 1991 <br /> ----------------------------------------------------------------------------------------------------- <br /> ----------------------------------------------------------------------------------------------------- <br /> Ownership Cost/hr = $44.18 $8.63 $6.70 $2.32 $35.68 <br /> Operating Cost/hr = $38.55 $7.55 $7.53 $5.47 $31.52 <br /> Operator Cost/hr = $21.58 $20.84 $20.84 $21.58 521.58 <br /> Assistant Cost/hr = S2D.69 $0.00 $0.00 $0.00 $0.00 <br /> ----------------------------------------------------------------------------------------------------- <br /> Total = $125.00 537.02 $35.07 $29.37 $88.78 <br /> ------ ------ ------- ------- ------- <br /> Materials 8 Supplies: Description S/unit unit cf/unit <br /> ------------------ <br /> Portland Type II Cement $9.00 90# sack 3.00 <br /> Dry Grarwlar Bentonite $6.00 100# sack 3.00 <br /> Surgel Abandonment Fluid $6.00 100# sack 3.00 <br /> Octo Plug $4.35 each NA <br /> Marker $2.00 each NA <br /> ------------------------------------------------------------------------------ <br /> ITEMIZED TASK BREAKDOWN AND ASSOCIATED COSTS <br /> -------------------------------------------- <br /> -------------------------------------------- <br /> BOREHOLE OR PROJECT I.D.: P-1, P-2, P-3, P-5, P-6, P-7, P-8 <br /> -----------.---------------------------------------------------------------- <br /> Total Number of Holes: 7 No. Plugs/Hole: 1 Avg. unit volume (cf/lf): 0.0873 <br /> Av. Depth per Hole (ft.): 75.00 Plug Ht. (ft.): 7 Tot. cem. plug vol. (cf): 4.28 <br /> Av. Diam. per Hole (in.): 4.00 Type of Casing: PVC Remaining fill vol. (cf): 41.54 <br /> Task Item Task Description Quantity Unit S/Unit Cost <br /> -------------------------------------------------------------------------------------------------------- <br /> -------------------------------------------------------------------------------------------------------- <br /> Drill Rig Seal Holes with Bentonite 8.00 hour $125.00 $1,000.00 <br /> Water Truck Used with Bentonite and Cement 8.00 hour $37.02 $296.16 <br /> Flatbed Truck Haul Materials 8.00 hour $35.07 $280.56 <br /> Pickup Truck Haul Crew 8.00 hour $29.37 $234.96 <br /> Dozer Reclaim Small Pds 8.00 hour SM.78 $710.24 <br /> Cement Plug Holes 1.43 sack $9.00 $12.83 <br /> Bentonite * Seal Holes 12.42 sack $6.00 $74.53 <br /> Surgel * <br /> Octo-plug Plug 7.00 ea. $4.35 $30.45 <br /> Marker Mark Holes 7.00 ea. $2.00 $14.00 <br /> Miscellaneous <br /> -------------------------------------------------------------------------------------------------------- <br /> -------------------------------------------------------------------------------------------------------- <br /> * Select either bentonite or surgel; not both. TOTAL DIRECT COST : $2,653.72 <br /> sheet 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.