Laserfiche WebLink
sheet 1 of 2 <br /> Colorado Division of Minerals and Geology <br /> ESTIMATING FORM - STRUCTURAL DEMOLITION WORK <br /> -------------------------------------------- <br /> -------------------------------------------- <br /> Task No.: 50a Prepared by : SLB <br /> Permit No.: C-81-017 Filename : C017-50a <br /> Date : 30-Dec=94 f.I{.CIS Operation : Coal Basin Mines <br /> Permitting action : N/A <br /> Task description : additional structural demo items <br /> MEANS Location Adjustment: 99.70% of base unit costs - MEANS SITE WORK & LANDSCAPE COST DATA : 1994 Edition <br /> I I I I I MEANS BASEI ADJUSTED <br /> STRUCTURE / FACILITY / EQUIPMENT DESCRIPTION I DIMENSIONS I COMPOSITION I QUANTITY I UNIT I UNIT COST I TOTAL COST <br /> Mine #3 Structural Demolition I N/A I N/A ( 100 I N/A I $320.48 I $31,952 <br /> s Mine #5 Structural and Concrete Demolition I N/A I N/A 1 10 I N/A I $322.83 I 53,219 <br /> „ Mine #5 Concrete disposal I N/A 1 concrete 1 83 1 cu.yd. I 55.21 I $432 <br /> I I I I I I <br /> Corrections/Additions from previous estimate I I I I I I <br /> LOADOUT I I I I I I <br /> Load conveyor 1 48" - 550, 1 steel 1 550 1 lin.ft.1 $25.00 1 $13,709 <br /> storage conveyor 1 54" - 6001 1 steel 1 600 1 lin.ft.1 $25.00 1 514,955 <br /> ROCK TUNNEL I I I I I I <br /> conveyor ( 48" - 5,825' 1 steel 1 5,825 1 lin.ft.1 525.00 I 5145,188 <br /> l�G <br /> Loadout <br /> load conveyor 1 48" - 550, 1 steel 1 550 1 cu.ft. I (50.17)1 (S95) <br /> storage conveyor 1 54" - 600' 1 steel 1 600 1 cu.ft. I (50.17)1 (5104) <br /> ROCK TUNNEL 1 I I I I I <br /> conveyor 1 48" - 5,825' 1 steel 1 5,825 1 cu.ft. I (SO.17)1 (51,007) <br /> I I I I I i <br /> FAN CONCRETE REMOVAL I I I I I I <br /> I I I I I I <br /> Mine #1, Fan #1 1 4 - 16' X 1.5' X 3' 1 concrete 1 64 1 lin.ft.1 511.81 1 $754 <br /> Mine #1, Fan #2 1 2 - 10' X 1.5' X 3' 1 concrete 1 20 1 lin.ft.1 $11.81 1 $235 <br /> 1 2 - 27, X 1.51 X 31 1 concrete 1 54 1 lin.ft.1 511.81 I 5636 <br /> Mine #2, Fan #4 1 2 - 141 X 1.51 X 3' 1 concrete 1 28 1 lin.ft.1 511.81 I 5330 <br /> 1 2 - 16, X 1.51 X 3' 1 concrete 1 32 1 lin.ft.1 511.81 I 5377 <br /> Mine #4, Fan #7 1 2 - 8' X 1.5' X 3' 1 concrete 1 16 1 lin.ft.1 511.81 1 $188 <br /> 1 2 - 14' X 1.51 X 31 1 concrete 1 28 1 lin.ft.1 511.81 1 $330 <br /> Mine #4, Fan #8 1 2 - 8' X 1.5' X 3' 1 concrete ( 16 1 lin.ft.1 511.81 1 $188 <br /> 1 2 - 14, X 1.51 X 3' 1 concrete 1 28 1 lin.ft.1 511.81 I 5330 <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> TASK SUBTOTAL - sheet 1 $211,615 <br />