Laserfiche WebLink
WT-56 <br /> sheet 7 of 8 <br /> STRUCTURAL DEMOLITION WORK cont'd <br /> -------------------- <br /> I MEANS BASE TOTAL <br /> STRUCTURE / FACILITY / EQUIPMENT DESCRIPTION DIMENSIONS COMPOSITION QUANTITY I UNIT UNIT COST COST (S) <br /> CONCRETE DISPOSAL, ON SITE <br /> Mine #1 N/A concrete 249 cu.yd. $5.10 $1,266 <br /> Mine #2 N/A concrete 37 cu.yd. $5.10 $188 <br /> Mine #3 N/A concrete 301 cu.yd. $5.10 51,529 <br /> Mine #4 N/A concrete 392 cu.yd. $5.10 $1,994 <br /> Mine #5 - none remains N/A concrete cu.yd. <br /> Rock Tunnel N/A concrete 200 cu.yd. $5.10 $1,017 <br /> Sutey Refuse Area ( N/A concrete 38 cu.yd. $5.10 $193 <br /> Old Refuse Area N/A concrete 5 cu.yd. $5.10 $25 <br /> Shop N/A concrete 1,365 cu.yd. $5.10 56,941 <br /> Preparation Plant N/A concrete 581 cu.yd. $5.10 $2,954 <br /> Carbondale Loadout N/A concrete 155 cu.yd. $9.24 $1,428 <br /> Powerline Removal, transmission rate; 3.67 mi miles @ 17 poles/mile wood/wire 62 pole $1,070.59 $66,177 <br /> Powerline Removal, distribution rate; 5.38 mi miles @ 17 poles/mile wood/wire 91 pole $535.29 $48,565 <br /> Equipment Yard Debris <br /> Rock Tunnel 400' x 100' X 51, 30% N/A 2,222 cu.yd. $6.11 $13,536 <br /> Rock Tunnel 50' X 150' X 51, 30% N/A 417 cu.yd. $6.11 $2,538 <br /> Shop 250' X 250' X 51, 30% N/A 3,472 cu.yd. $6.11 $21,152 <br /> Preparation Plant 50, X 50' X 51, 30% N/A 139 cu.yd. $6.11 5846 <br /> Hazardous Waste Materials, all areas <br /> testing and removal 10 - 55 gal.drums N/A 10 drum $1,500.00 $14,955 <br /> CULVERT REMOVAL, ALL AREAS I I <br /> 13" - 18" Culverts Assume 50' length CMP 36 each ( $97.54 $3,501 <br /> 24" Culverts Assume 50' length CMP 19 each $128.61 $2,436 <br /> 301, - 36" Culverts Assume 50' length CMP 14 each $204.13 $2,849 <br /> TASK SUBTOTAL - sheet 7 $194,091 <br />