My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (184)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (184)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 8:50:25 AM
Creation date
10/19/2012 10:20:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br /> ESTIMATING FORM - HYDRAULIC EXCAVATOR WORK <br /> Task #: 32 Prep. by: SLB Task File Name: C017-32 <br /> Date: 03N 4 Permit #:C-81-017- Mine: Coal Basin Mines <br /> i <br /> Permit Action: N/A <br /> Task Description: Reduce Road C to Post Mine Width <br /> --.-----------------------------------------...__.._----.. ----- <br /> HOURLY EQUIPMENT COST <br /> --------------------- <br /> --------------------- <br /> Basic Machine: CAT 2458 (1990) Shift Basis:l/day <br /> CostBreakdown: ----------------- ---------- <br /> Utilization % Horsepower 360 <br /> Ownership cost/hr = $77.58 N/A ---------- <br /> operating & overhaul cost/hr= $64.96 100 Weight-tons: 0.00 <br /> Operator cost/hr = $21.76 N/A ---------- <br /> -------- (DQ I 6§0) <br /> Total eqpt. unit cost/hr = $164.31 Total fleet cost/hr: $164.31 <br /> .,...------ ----_------ <br /> MATERIAL QUANTITIES <br /> ------------------- <br /> ------------------- <br /> Initial Swell Loose <br /> Volume: 3,042.0 BCY Factor: 1.25 Volume: 3,802.5 cu. yds. <br /> ------------ ---------- ------------- <br /> Source of quantity take-off: Division Estimate <br /> ---------------------------------------------------- <br /> Source of est. swell factor: Division Estimate <br /> .,._____-___----------------------------------------- <br /> HOURLY PRODUCTION <br /> ----------------- <br /> ----------------- <br /> Cycle Time - Basic cycle time vs. job condition rating: SEVERE <br /> ---------- - Time value within basic rating: MAXIMUM <br /> Basic cycle time = 0.83 min. <br /> Bucket Capacity ------------- <br /> -------------- <br /> Rated capacity: 2.50 LCY (heaped) Size class: small <br /> Bucket fill factor: 0.68 USER-PROVIDED BUCKET FILL FACTOR <br /> ------- --------------------------------------------------- <br /> Adjusted capacity: 1.70 LCY <br /> Job Condition Correction Factors - Altitude adj. = 1.00 (C/H 15s) <br /> _ _.._—_--------------- - Job efficiency = 0.83 (1 s/d Yl1A) <br /> Site altitude = 10,000 ft. ----------- <br /> --- Net correction 0.83 <br /> Unadjusted hourly unit production 122.45 LCY/Hr <br /> Adjusted hourly unit production 101.63 LCY/Hr <br /> Adjusted hourly fleet production 101.63 LCY/Hr <br /> JOB COST <br /> Fleet Size: 1 Excavator(s) Total Job Time: 37.41 Hours <br /> Unit Cost : $1.617 /cu. yd. Total Job Cost: $6,147.35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.