Laserfiche WebLink
Sheet 1 of 3 <br /> Colorado Division of Minerals and Geology <br /> ----------------------------------------- <br /> ESTIMATING FORM - TRUCK/LOADER TEAMS <br /> ------------------------------------ <br /> ------------------------------------ <br /> Task No. 20 Prep. By: SLB Permit No. C-81-017 <br /> ---------- <br /> -------- -------- <br /> Date : 12/20/94 Filename: C017-20 Operation: Coal Basin Mines <br /> ---------- ________ ______________________________ <br /> Permit Action : N/A <br /> Task Description : Backfill rock tunnel faceup with tunnel pad material <br /> ___________________________________________________________ <br /> HOURLY EQUIPMENT COSTS: <br /> Single, Double or Triple <br /> County: PITKIN Labor Zone : 2 Shifts S <br /> ----------- -------- --________ <br /> Equipment Descriptions <br /> Truck/load team - Truck :Generic 18t, 12.0-18.Ocy, 350hp 6x4 d. on/off-hw <br /> - Loader :CAT 966E <br /> Support equip. - Load area:CAT D8L with straight blade <br /> - Dump area:CAT D8L with straight blade <br /> Road maint. - Grader :N/A <br /> - Water T. :N/A <br /> __________________________________________________ <br /> Truck/Load Team Support Equipment Road Maintenance <br /> Truck Loader Load area Dump area Grader Water T. <br /> Equipment Filename:18CYHLTK 966ELODR D8L-SDZR D8L-SDZR N/A N/A <br /> ________ ________ ________ _________ -------- <br /> utilization on job o <br /> -Machine: 990 100% 25% 100% N/A N/A <br /> -Ripper : N/A N/A- N/A N/A N/A N/A <br /> ________ ________ ________ ________ _________ -------- <br /> Cost Breakdown <br /> -------------- <br /> Ownership cost/hr: $23.03 $29.29 $42.79 $42.79 N/A N/A <br /> Operating cost/hr: $20.94 $21.05 $11.46 $45.83 N/A N/A <br /> Ripper Op. cost/hr: $0.00 $0.00 $0.00 $0.00 N/A N/A <br /> Operator cost/hr: $21.40 $20.38 $20.89 $20.89 N/A N/A <br /> -------- -------- -------- -------- --------- -------- <br /> Unit subtotals : $65.37 $70.72 $75.14 $109.51 N/A N/A <br /> ________ ________ ________ ________ _________ ________ <br /> # of eqp. units : 2 1 1 1 0 0 <br /> Group subtotals- T/L team: $201.47 Support: $184.64 Rd. Maint.: $0.00 <br /> --------- <br /> --------- -------- <br /> Total Work Team Cost/Hr $386.11 <br /> MATERIAL QUANTITIES: <br /> ------------------- <br /> ------------------- <br /> Be9 <br /> Volume: 48,400 ICY <br /> Cu,yd. ---------- Swell Loose <br /> Volume: 48,400 LCY Factor: N/A Volume: 48,400 ICY <br /> ---------- ---------- __-________- <br /> Source of quantity take-off:volumes from 1983 estimate; permit modifications <br /> _______________________________ <br /> Source of est. swell factor:N/A <br /> __________________________________________ <br />