Laserfiche WebLink
NOV 24 '97 04:32PM DMG DURANGO FIELD OFFICE P.5i7 <br /> Sheet 1 of 3 <br /> Colorado Division of Minerals and Geology <br /> -------------------------- ---.----------rrr- <br /> ESTXKKTING FORK - TRQCK/LDADER TEMS <br /> Task No. 2 prep- Sy: TDG Permit No. C-99-999 <br /> Date : ~-11/24/97 Filename; C999.2 Operation; Lower Sutey Access Road <br /> ---------- --------- ------------------------------ <br /> Permit Action : Cost Estimate <br /> rr-r+- rrrrrr--- rr -----r-----------"------------------------- <br /> Task Description : Load & Haul topsoil (spreading not included) <br /> ------------------------------------------------------.-.------ <br /> HOMLY EQIIZPXCIT COSTS: <br /> Single, Double or Triple <br /> Cout:ty: GARFIBLD Labor Zion l Shifts 7 S <br /> Equipment Descriptions <br /> Truck/load team - Truck CRXMIC 10t, 7.3 to 10.4 cy, on or off-highway <br /> - Lowder : CAT 966F <br /> Support equip. - Load area: N/A <br /> - Dump area: N/A <br /> Road maint. - Grader bT/A <br /> Water T. N/A <br /> -------------J--------------------N--------M-------- <br /> Truck/Load Team Support Equipment Road W.atenance <br /> Truck Loader Load area Dump area Grader Nat" T. <br /> Equipment Filename; lOCYHLTX 966FLOOR x/A N/A X/A M/A <br /> ------- -------- ---------- -------- ---------- -------- <br /> Atili:ation on job <br /> -Maehine: 100% 100% N/A N/A N/A N/A <br /> -Ripper N/A N/A N/A N/A N/A N/A <br /> -----. rr r------- -------- ----- -- -----rrr- ------- <br /> Cost Dreakdown <br /> -------------- <br /> Ownership cost/kw $12.19 $25.03 N/A K/A N/A N/A <br /> Operating cost/hr: 015.60 $25.93 N/A DT/A N/A N/A <br /> Ripper op. cost/hr: $0.00 $0.00 N/A N/A by/A N/A <br /> Operator coat/hr: $21.60 $22.04 N/A N/A M/A N/A <br /> -------- -------- -------- -------- --------- ------- <br /> Unit subtotals : $49-38 $72.99 N/A N/A N/A N/A <br /> # of ecip. units : 5 1 0 0 0 0 <br /> ---- -- -- ---- - --- rrr- ---- <br /> Group subtotals- T/L team $319.90 Support; $0.00 Rd. Maint. ; $0.00 <br /> --------- --------- --------- <br /> Total Work Team Cost/Hr $319.90 <br /> rr r r r r r r r <br /> MATMTAL QDANTITTBS: <br /> sag. <br /> volume: 2,331 CCY <br /> Cu.Yd- ---------- ill Loose <br /> volume: 2,331 CCY Factors 1.135 volume: 2,646 LCY <br /> ---------- ---.-------- ----------- <br /> Source of quantity take-off: S. Renner <br /> -------------------- ------------------------------ <br /> Source of eat. swell factor: Cat Handbook <br /> ------ -------r r----rrr--r--r--rrr--------------rr r <br />