Laserfiche WebLink
NOV 24 '97 04:31PM DMG DURANGO FIELD OFFICE P.2f7 <br /> Sheet 1 of 3 <br /> Colorado Division of Minerals and Geology <br /> ------------------------------ »»»..» <br /> ESTnMTIXG FORM - TRMM/LOADER. TXM9 <br /> Task No. 1 prep- BY TDG Permit No. C-99-999 <br /> pate 11/24/97 Filename: C999-1 Operation: Upper 3utey ACC®8s Road <br /> ----.------ --------- ------------------------------ <br /> Permit Action Cost Betimate for S. Renner <br /> -------------------------- -.-.---..-... ----------------»----- <br /> Task D®scriptiom Load & haul topsoil (not incl., spreading) <br /> ----»-..........---- _..-------------------------------------- <br /> BQTRLY NQTJIPNMffT COSTS: <br /> �,e..................�a Single, Double or Triple <br /> County: GARFIELD Labor Zone 1 Shifts 8 <br /> Equipment Descriptions <br /> Truck/load team - Truck GHIMZC lot, 7.5 to 10.4 cy, on or off-highway <br /> - Loader CAT 966F <br /> Support equip. - Load area: N/A <br /> Dump areas N/A <br /> Road maint. - Grader 1i/A <br /> Water T. NIA <br /> »»-»»---------------------------------------------- <br /> Truck/Load Team Support Bquipmtent Road Maintenance <br /> Truck Loader Load area Dump area Grader water T. <br /> Equipment Filename: 10CYHLTH 966PILODR M/A N/A N/A LQ/A <br /> -------- -------- -------- -------- ------- ------- <br /> Utilization on job <br /> -Machine: 10096 100% N/A N/A N/A N/A <br /> -Ripper : N/A N/A N/A N/A N/A N/A <br /> -------- - ------ --- --- -------- --------- -----_- <br /> Cost Breakdoim <br /> -------------- <br /> Ownership cost/hr: $12.18 $25.03 N/A N/A N/A N/A <br /> Operating cost/hr: $15.60 $23.93 N/A X/A N/A N/A <br /> Ripper Op, coat/hr: $0.00 $0.00 N/A N/A H/A H/A <br /> Operator cost/hr: $21.60 $22.04 N/A N/A N/A N/A <br /> -------- -------- -------- -------- --------- ------- <br /> -'nit subtotals : $49.38 $72.99 NIA N/A N/A N/A <br /> -------- -------- --------- -------- --------- ------- <br /> $ of eqp. units : 5 1 0 0 0 0 <br /> Group subtotals- T/L team : $319.90 Support: $0.00 Rd. Maint.: $0.00 <br /> ------ --------- <br /> Total Work Team Cost/EW $319.90 <br /> K&TEo_T L QUANTITIES: <br /> ..................o <br /> Beg. <br /> Volume: 2,396 CCY <br /> cu.Yd- »»------»» Small Loose <br /> Volume: 2,396 CCY Factor: 1.135 Volume: 2,719 LCY <br /> Source of quantity take-off: S. Roomer <br /> ..---------»»-----------»---»»»--------------------- <br /> Source of out. smell factors Cat Handbook <br /> ---------------------------------------------------- <br />