Laserfiche WebLink
Task component3 /95 <br /> host:Est. <br /> *Grade stockpile area 637 <br /> *Rip Area <br /> *Hydro Control <br /> *Reveg. (5 AC) Drill 3,905 <br /> "� kr•- Concrete Removal 's-0) 230,023 <br /> r <br /> Topsoil Conveyor Corridor 6,241 <br /> (150) <br /> Prep Plant Area <br /> (est. 10 AC) <br /> Haul Sutey Material to p.p. 57,170 <br /> Area (81) <br /> Concrete Removal 85,589 <br /> Grade Rubble (176) 17,618 <br /> Compact Refuse at Prep Plant 8,387 <br /> (86) <br /> Rip (71.73?) 1,063 <br /> Grade Area (155) 12,202 <br /> 17 <br />