Laserfiche WebLink
Task Component 3/1/95' 3/16/ <br /> Copt Est. Cost Egt <br /> *Reveg. (2 + 2) (140 and 141) 4019 7,471 <br /> *Grade Conveyor Line (246) 480 <br /> *Reveg. Conveyor Line ( 2 + 2,790 5,160 <br /> 1) (140 and 141) <br /> Seal Coal Entry (Done) (incl. 2,524 incl. #51 <br /> w/Mine #2, Task 51) <br /> *Backfill Coal Entry (incl. w/ incl. #3 <br /> Mine #2, Task #3) <br /> Backfill Coal Entry Bench incl. #179 <br /> (Incl. w/ Mine #2, Task #179) <br /> Hydro Control <br /> Lower Bench Backfill Lower Coal Bench 18,961 <br /> (201) <br /> Backfill Lower Coal Bench 11,611 <br /> (204) <br /> Compact bench fill (211) 1,630 <br /> Grade (135) 382 <br /> Rip Bench Remnant (174) 277 <br /> 12 <br />