Laserfiche WebLink
Task. Component 3 1 95 3 16 95 <br /> Cast Est. Cost Est. <br /> * Reveg. Bench & Outslopes 2,009 3,736 <br /> 1 + 1 (140 and 141) <br /> Grade Bench (135) 127 127 <br /> *Grade Road (144) 6,395 8,394 <br /> *Rip Road (134) 799 1,049 <br /> Reveg. Road (1 + 1) (140 and 2,009 3,736 <br /> 141) <br /> *Hydro Control on fan road 2,086 <br /> (237) <br /> Mine 2 Seal Mine 2 (Done) (51) 2,524 13,881 <br /> All Acreages Backfill Mine 2 Entry (Done) 1,117 1,117 <br /> Estimated (3) <br /> Backfill Bench (179) 25,629 9,657 <br /> Backfill Bench (205) 4,360 <br /> Compact bench fill (212) 830 <br /> Concrete Removal (50) 5,389 7,375 <br /> Berms & Ditches (175) 1 6,181 2,492 <br /> 10 <br />