Laserfiche WebLink
Task Component 3/1/95 3/16/95 <br /> Cost Est. Cost Est. <br /> Reveg? Additional Dozer Support A 15,148 18,104 <br /> (225) <br /> Additional Dozer Support B 2,887 <br /> (225) <br /> ,A,v7T � Hydro Control Road A - 4,172 <br /> Rolling dips, low water <br /> crossings, drop structures (236, <br /> 237, and 238) <br /> "-- Hydro Control Road B - 15,601 <br /> Rolling dips, low water <br /> crossings, drop structures (236, <br /> 237, and 238) <br /> k Revegetation, Road A (140 and 14,276 <br /> 143) <br /> Revegetation, Road B (140 and 17,853 <br /> 143) <br /> Mob/Demob (Drainage, 4,074 <br /> Roads) (260) <br /> Job Superintendent (263) 11,849 <br /> ti Pr <br /> Maintenance Roads (10 Yrs) (242) 17,792 17,154 <br /> Rill & Gully Repair (241) 17,080 17,080 <br /> -= 23 '; <br />