Laserfiche WebLink
Task Component 3/1/95 3/16/95 <br /> Cost Est. Cost Est. <br /> *Reveg. Stockpile Area 14,242 <br /> (10 AC) (140) <br /> *Hydro Control <br /> Rip (70,73) 1,430 1,979 <br /> *Remove coal from upper <br /> stockpile <br /> *Haul material to prep plant <br /> *Grade stockpile area (135) 637 637 <br /> *Rip Area (70) 880 <br /> *Hydro Control <br /> *Reveg. (5 AC) Drill (140) 3,905 7,121 <br /> Concrete Removal (50) 230,023 230,023 <br /> Topsoil Conveyor Corridor 6,241 6,241 <br /> (150) <br /> Prep Plant Area <br /> (est. 10 AC) <br /> Haul Sutey Material to p.p. 57,170 57,170 <br /> Area (81) <br /> 20 <br />