Laserfiche WebLink
Task Component 3/1/95 3/16/95 <br /> Cost Est. Cost Est. <br /> Additional Dozer Support 4,458 <br /> Road D (225) <br /> Additional Dozer Support 5,327 <br /> Road E (225) <br /> Additional Dozer Support 9,310 <br /> Road F (225) <br /> Additional Dozer Support 5,126 <br /> Road G (225) <br /> Mob/Demob (Road 4,074 <br /> Reclamation) (166) <br /> Job Superintendent (263) 17,146 <br /> Rock Tunnel Seal Entries (Done) (51) 2,524 15,160 <br /> Backfill Entries (7) 1,675 1,675 <br /> Backfill Bench (20 & 21) 79,397 79,397 <br /> Concrete Removal (50) 43,642 54,971 <br /> Berms & Ditches (175) <br /> Rip (72) 586 586 <br /> Remove 10 ft. Culvert (240) 1,815 1,818 <br /> 18 <br />