Laserfiche WebLink
06pp <br /> Backfill Entry (Done) (11) 1,489 <br /> Berm& Ditch Construction 6,181.20 <br /> Topsoil (Done) (200) 11,269 <br /> Road G' Hydrologic Control (Low wtr <br /> crossings) <br /> Mob/Demob <br /> Mine 3 (Acreages Backfill Portals (Done) (9) 1,489 D..3 CL <br /> Estimated) <br /> G,op cf-YL. <br /> Backfill Bench (180) 14,864 n. <br /> -7 - <br /> Berms & Ditches 6,181 <br /> t 71 e <br /> !Up Bench (172) 914 f— <br /> Reveg. Bench 4,018.6 <br /> (2 AC/2 AC) <br /> F- I- S <br /> Reveg. Outslopes 8,597 K _T <br /> (est- 7 AC) <br /> Remove-Conveyor Foundations 47. 3 <br /> *Hydro, Control Gn Conveyor y,u S r <br /> *Backfill Lower Bench C_ <br /> *Hydro Control, Lower Bench 5— T(/ C_ <br /> V1 <br /> 4 <br /> _j <br />