Laserfiche WebLink
Task Component 3/1/95 3/16/95 <br /> Cost Est. Cost Est. <br /> Mob/Demob (Mine 5 & G 5,563 <br /> Road) (161) <br /> Job Superintendent (263) 18,122 <br /> Mine 3 (Acreages Backfill Portals (Done) (9) 1,489 1,489 <br /> Estimated) <br /> Backfill Bench (180) 14,864 27,075 <br /> Backfill Bench (206) 21,386 <br /> Compact bench fill (213) 2,328 <br /> Berms & Ditches (175) 6,181 8,724 <br /> Rip Bench (172) 914 934 <br /> Reveg. Bench (140 and 141) 4,018.6 7,471 <br /> (2 AC/2 AC) <br /> � N <br /> A N DiN F-S Reveg. Outslopes 8,597 (determinedo c m e ,, r (est. 7 AC) nnecessary <br /> Remove Conveyor Foundations 47 162 <br /> (50) <br /> /NvT 1n, GAn/ *Hydro Control on Conveyor <br /> *Backfill Lower Bench (incl. incl. #180 <br /> i, #180) <br /> 6 <br />