Laserfiche WebLink
Task Component 3/1/95 3/16/95 <br /> Cost Est. Cost Est. <br /> Rock Tunnel Grade (156) 13,672 13,341 <br /> Dump <br /> L ,�„� Diversion (137 and 229) 35,056 13,621 <br /> Topsoil (146) 18,499 8,487 <br /> Revegetation 5.2 AC. (140) 4,956 7,406 <br /> A.d T f N <br /> Access Rd Rip (1.2 AC) (220) 479 165 <br /> Access Rd Grade (134) 3,837 986 <br /> Access Rd Revegetation .83 937 1,182 <br /> acres (140) <br /> /�r r , �.• Terrace Rock Tunnel Pile 4,576 4,593 <br /> �,yi✓ (218) 1 A.,e L <br /> Mob/Demob (Sutey, Old 4,903 <br /> Refuse & Rock Tunnel <br /> Dumps) (160) <br /> Job Superintendent (263) 17,425 <br /> #5 Fan Backfill and Compact Bench 1,795 871 <br /> (177, 202, 209) <br /> Backfill Portal (8) (Done) 372 744 <br /> 3 <br />