Laserfiche WebLink
Reclamation Tasks by Location, Grouped by Anticipated Bids <br /> Task Component 3/1/95 3/16/95 <br /> Cost Est. Cost Est. <br /> Sutey Pile Final Grade (135) 1,071 1,071 <br /> Foundation Removal (50) 319 6,531 <br /> Channel Installation, Terracing 6,865 6,890 <br /> (217) <br /> Downdrain (233) 5,049 <br /> Diversion (234) 4,444 16,416 <br /> Topsoil (145) 28,169 28,169 <br /> Revegetation Drill e 1,124 Is/nC (IS) 14,173 25,985 <br /> Broadcast Ca` 2311 3R/nC (2) (140 and <br /> 141) <br /> LCAST S the <br /> r+ C, DetiT* L Access Road (37) 8,366 8,366 <br /> Ditch Lining (235) 4,444 3,648 <br /> �Asr SrOt- <br /> Access Road Revegetation 1.25 4,168 <br /> I" c' De"-7'r L acres (141) <br /> N o rt /N Sutey West Road rolling dips 2,781 <br /> P LAN (237) <br /> 1 <br />