Laserfiche WebLink
Task 63 - Rip Road D surface <br /> Area to be ripped is 22' wide, 10,350' long. Ripping depth is 1.5'. Rule 4.03.3 <br /> Task 64 - Rip Road E surface <br /> Area to be ripped is 22' wide, 5,350' long. Ripping depth is 1.5'. Rule 4.03.3 <br /> Task 65 - Rip Road F surface <br /> Area to be ripped is 22' wide, 9,350' long. Ripping depth is 1.5'. Rule 4.03.3 <br /> Task 66 - Rip Road G surface <br /> Area to be ripped is 22' wide, 11,900' long. Ripping depth is 1.5'. Rule 4.03.3 <br /> Task 70 - Rip shop area <br /> Area to be ripped is 3.0 acres, as estimated from aerial photographs. Ripping depth required is <br /> 2.5'. Rule 4.06.4 <br /> Task 71 - Rip prep. plant area <br /> Area to be ripped is 1.75 acres, as estimated from aerial photographs. Ripping depth required <br /> is 2.5'. Rule 4.06.4 <br /> Task 72 - Rip Rock Tunnel facility pad <br /> Area to be ripped is 2.0 acres, as estimated from aerial photographs. Ripping depth required is <br /> 2.5'. Rule 4.06.4 <br /> Task 73 - Rip coal stockpile bases, prep. plant and warehouse <br /> Area to be ripped is 3.75 acres, as estimated from aerial photographs. Ripping depth required <br /> is 2.5'. Rule 4.06.4 <br /> Task 74 - Rip office/warehouse area <br /> Area to be ripped is 1.75 acres, as estimated from aerial photographs. Rule 4.06.4 <br /> Task 81 - Haul refuse from Sutey to prep. plant <br /> Information based on permit cross sections and tables. Material is hauled from Sutey refuse pile <br /> to prep. plant to provide additional backfill for the prep. plant area highwall. Permit @ V-D- <br /> 3.d.; App V-E-3 <br /> Task 82 - Haul warehouse coal stockpile base to prep. plant <br /> Stockpile base (upper three feet) is hauled from the warehouse coal stockpile to prep. plant to <br /> provide additional backfill for the prep. plant area highwall, and to provide for required 4' of <br /> cover over combustible materials. Rules 4.04 (1) and 4.04 (2). <br /> Coal Basin Estimate Summary 7 April 4, 1995 <br />