Laserfiche WebLink
Work performed: Site preparation (earth work) for <br /> the overland conveyor system as <br /> well as for the rock tunnel <br /> disposal area sediment ponds . <br /> Dates of May through uctober 1y)84 . <br /> participation: <br /> Methodology: Standard earth moving practices . <br /> Organization: ACZ Commercial Laboratories <br /> Address : 1475 Pine Grove Road, Suite 109 <br /> Steamboat Springs, CO 80477 <br /> Individual/area of Ralph Toulsen, Laboratory Director <br /> expertise : <br /> Work performed: Environmental testing of surface <br /> and groundwater quality. <br /> Methodology: EPA Methods of Water Analysis, and <br /> "standard methods for the <br /> examination of water and waste <br /> water. " <br /> Organization: Golder Associates <br /> Address : 17301 West Colfax Ave . <br /> Suite 275 <br /> Golden, CO 80401 <br /> Individual/area of Michael Bukovonsky, Engineering <br /> expertise : Consultant <br /> Graeme Major, Geotechnical Engineer <br /> Work performed: Design engineering for the <br /> expansion of the coal refuse <br /> disposal area. <br /> Dates of April and May, 1986 <br /> participation: <br /> Methodology: Standard geotechnical engineering <br /> practices following field testing <br /> and sample collection and <br /> - - analysis . <br /> A review of the approved permit, Vol . 7, Chapter V, Reclamation <br /> Plan, indicates : <br /> - 28 - <br />