Laserfiche WebLink
amec-�' <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Mill Site <br />Earthworks project. <br />AMEC inspected and approved 80 mil primary geomembrane within the Mill Site Earthworks project. <br />AMEC observed anchor trench excavation and backfill for the Mill Site Earthworks project. <br />AMEC observed DCF placement within the Mill Site Earthworks project, including ambient and fill <br />temperature monitoring when necessary. <br />AMEC observed overburden fill placement for the Mill Site Earthworks project, including ambient and fill <br />temperature monitoring when necessary. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />Samples Obtained <br />DCF -2 <br />SLF — 2 <br />Testing Performed <br />SLF Moisture /Density — 9 <br />SLF Depth Checks — 4 <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue subgrade acceptance prior to SLF placement. <br />Continue SLF placement. <br />Continue subgrade acceptance prior to geomembrane deployment <br />Continue anchor trench excavation. <br />Continue geomembrane installation. <br />Continue anchor trench backfill. <br />Continue geomembrane acceptance prior to DCF placement. <br />Continue overburden fill placement. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC &V: <br />CC &V held a weekly construction meeting on October 9, 2012. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />AMEC: <br />Daily toolbox safety meeting were attended by AMEC personnel. <br />MEW Weekly Report WE 10. 13.2012 <br />