Laserfiche WebLink
Colorado Division of Minerals and Geology <br /> ----------------------------------------- <br /> ESTIMATING FORM - SCRAPER WORK <br /> TASK NO. 01 PREP. BY: SGR PERMIT NO. C-81-017 <br /> ........ -------- <br /> DATE : 09/07/94 FILENAME: C017-01 OPERATION: Coal Basin <br /> ---------- »»»»»»» »»» »»»»»»»»»»»-- »»»»»» <br /> PERMIT ACTION : revocation <br /> -»»»_»»-»--»»»»»»»»»--------»----»»»»»»----»»-»»--»» <br /> TASK DESCRIPTION : topsoil sutey <br /> HOURLY EQUIPMENT COSTS: <br /> Single, Double or Triple <br /> County: PITKIN Labor Zone : 2 Shifts S <br /> »»»»»»»»»»» »-----»» -------- <br /> Equipment Descriptions <br /> Scraper team make-up :CAT 631D with ROPS cab <br /> Road maint. - Grader :N/A <br /> - Water T. :N/A <br /> ------------------------------------------- <br /> Scraper Team Road Maintenance <br /> Scraper Dozer(s) Grader Water truck <br /> Equipment Filename:631D-ROP N/A N/A <br /> »»»»»»-- -»»»»»-» »--»»»»»» -»»----»» <br /> Utilization on job: 100% N/A N/A N/A <br /> »»»-»»»» »--»»»-- »-»»»-»-- --------- <br /> Cost Breakdown: <br /> -------------- <br /> Ownership cost/hr: $43.33 N/A N/A N/A <br /> Operating cost/hr: $77.35 N/A N/A N/A <br /> Operator cost/hr: $20.56 N/A N/A N/A <br /> -------- -------- --------- --------- <br /> Unit subtotals: $141.24 N/A N/A N/A <br /> »»»»»»»» ----»»-- »-»»»---- »»-»--»»» <br /> Scraper team subtotal $282.47 Maint. subtotal N/A <br /> »»»»»»»»»- <br /> Total Work Team Cost/Hr: $282.47 <br /> MATERIAL QUANTITIES: <br /> ------------------- <br /> ------------------- <br /> Beg. <br /> Volume: 40200 CCY <br /> Cu.Yd. ---------- Swell Loose <br /> Volume: 40,200 CCY Factor: 1.215 Volume: 48,843 ICY <br /> »»»»»»»»»» »»»»»»»»»» ----»»»»»-»»_ <br /> Source of quantity take-off:permit <br /> ---------- <br /> Source of est. swell factor:tables <br /> ------------_.....---»»»»---------»------»»»- <br />