Laserfiche WebLink
After the successful bidder has furnished evidence of the FHP capacity of the equipment <br /> to be used, the amount bid for Equipment Rental will be modified by reversing the above <br /> procedure to reflect the unit price desired by the CONTRACTOR with a corresponding <br /> reduction in the quantity of hours required. This modified hourly rate and number of hours <br /> will appear on the Purchase Order. <br /> 19.3 EXECUTION <br /> Operators <br /> The equipment shall be furnished complete with competent operating personnel. Operators <br /> shall be qualified to perform all work under this specification in a skillful and <br /> workpersonlike manner. The OWNER may, in writing, require the CONTRACTOR to <br /> remove from the work any employee the OWNER deems incompetent or careless. The <br /> OWNER will be the sole judge of the acceptability of any employee. <br /> Supervision <br /> The CONTRACTOR shall be responsible for the supervision of all mechanical operations <br /> of the equipment including proper maintenance. <br /> Equipment maintenance, fueling and repairs shall be done sot that spilling of lubricants and <br /> fuel is minimized. <br /> Performance of Work <br /> Supplemental work shall be performed after the general construction work in that particular <br /> area and shall consist of general earthmoving or other finishing work as may be directed by <br /> the PROJECT MANAGER. <br /> All operations under this section will be under the direct supervision of the PROJECT <br /> MANAGER and work under this section shall be performed only as ordered and directed <br /> by the PROJECT MANAGER. The PROJECT MANAGER will designate the work to be <br /> performed and the order in which it is to be done, and WILL inspect all work. The <br /> PROJECT MANAGER will maintain documentation of the work. <br /> Equipment Rental Documentation <br /> a. The PROJECT MANAGER will maintain a job diary to record daily activities, <br /> progress and accomplishments. <br /> b. At the close of each day's operations during which equipment rental work has <br /> been conducted under this specification, the PROJECT MANAGER shall <br /> prepare, in duplicate, a form entitled "Equipment Rental Record" listing the date, <br /> times and total hours (computed to the nearest one-half hour), each piece of <br /> equipment was operated in accordance with this specification. <br /> 14 <br />