Laserfiche WebLink
Coal Basin/Sutey Pile Permit Revocation Project <br /> C-81-017 <br /> �r MVC_MfIIi S-345 <br /> BID SCHEDULE <br /> Qty Unit Unit Amount <br /> Item Description Price <br /> $ 27, 370 . 00 <br /> 1 Mobilization/Demobilization, per <br /> 1 Job N/A <br /> specifications g Job , 6 0 0 . 0 0 <br /> a) Remobilization, per <br /> ' 1 $ <br /> specifications, (if required) <br /> 2 Surface Drainages, per specifications <br /> t. $ 32. 50 $ 91 , 000 . 00 <br /> Channel A 2,800 Ln_ F <br /> 700 Ln. Ft. $ 4. 00 $ 2, 800. 00 <br /> Channel B 0 0 0. 0 0 <br /> 600 I_n. Ft. $ 15. 00 $ 9, <br /> Channel 51 , 840 . 00 <br /> 3 Earthwork, per specifications 1 Job N/A $ <br /> 4 Revegetation, per specifications <br /> 25 Acre $1 274 . 00 $ 31 850 . 00 <br /> , <br /> 5 Equipment Rental (if required) 8 8. 0 0 $ 5, 280 .00 <br /> a) Bulldozer, per specs 60 Hours $ — <br /> 80 Hours $ 49 . 00 $ 3, 920. 00 <br /> b) Backhoe/Loader, per specs 64. 00 $ 2, 560 .00 <br /> c) Dump Truck, per specs 40 Hours $ — <br /> GRAND TOTAL <br /> Enter here and on Invitation and Bid Sheet) $ 23 4, 2 2 0. 0 0 <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />