Laserfiche WebLink
;SEP 27 '94 04:50PM DIV/MINERALS&GEOLOGY P.9i10 <br /> fF <br /> v <br /> Coal Basin/Sutey Pile Permit Revocation Project <br /> C-81-017 <br /> MVC-NENES-345 <br /> BID SCHEDULE <br /> Item Description Qty Unit Unit Amount <br /> Price <br /> I Mobilization/Demobilization, per 1 Job N/A $ 27, 370. 00 <br /> specifications <br /> a) Remobilization, per 1 Job S 8, 600 . 00 <br /> specifications, (if required) <br /> 2 Surface Drainages, per specifications <br /> Channel A 7,$00 IxL FL S 3 2.5 0 $--Li ,0 0 0.0 0 <br /> Channel B 700 Ln. Ft. $ 4.00 S 2,8 0 0. 0 0 <br /> Channel C 600 La. Ft_ S 1 5-0 0 S 91 0 0 0-0 0 <br /> 3 Earthwork, per specifications 1 Job N/A $ 510,840.00 <br /> 4_ Revegetation, per specifications 25 Acre SI 2 7 4.4 O s 31 ,850.00 <br /> 5 Equipment Rental (if required) <br /> a) Bulldozer, per specs 60 Hours S 8 8-0 0 S 5,280.00 <br /> b) Backhoe/Loader, per specs 80 Hours S 4 9.o o S 3,920.00 <br /> per specs 40 Hours S 64. 00 S_ 2, 560.00 <br /> c) Dump Truck, P F -- <br /> GRAND TOTAL (Enter here and on Invitation and Bid Sheet) $ 134,220.00 <br /> THIS BID SCHEDULE MUST BE RETURNED )VnE YOUR BID <br /> Page 1 of 1 Page - <br />