aRECEIVEC� <br /> CHANGE ORDER OCT 16 1991 <br /> MINED LAND RECLAMATION DIVISION Mined Land <br /> INACTIVE MINE RECLAMATION PROGRAM Reclamation, Division <br /> Purchase Order Number: C-90046 Date: September 18, 1991 <br /> Purchase Requisition Number: PKA-2-011 <br /> Change Order Number: 1 <br /> Name of Project: Coal Basin RN-MINES-270 <br /> Contractor: Western States Reclamation <br /> 11730 Wadsworth Blvd. , Broomfield, CO. , 80020 <br /> The following changes are hereby made to the Purchase Order: <br /> 1. The dozer used for the project had a 330FHP versus a 410FHP as originally <br /> submitted. The adjusted rate is figured as such: 330/410 x <br /> $114.00/hr.(rate submitted for 410FHP) = $91.76/hr for the 330FHP dozer. <br /> Affected hours under Item #2 are increased to 86.9 hours by dividing the <br /> submitted price of $7,980.00 by the hourly unit cost of $91.76. Affected <br /> hours under Item #4 are likewise increased to 49.7 hours. <br /> 2. A 180FHP excavtor was used versus the minimum and submitted bid 58FHP <br /> backhoe. The adjusted rate is figured as such: 180/58 x $57.00/hr. <br /> (rate submitted for 58FHP) = $176.90/hr for the 180FHP excavator. Hours <br /> under Item #7 are affected and are decreased by dividing the submitted <br /> price of $2,280.00 by the hourly unit cost of $176.90 to obtain 12.9 <br /> hours. <br /> 3. The use of a front loader was required for placement of riprap into <br /> designated portions of a constructed ditch. This item will be separately <br /> billed as Item #9 using the above adjusted bid price submitted for a <br /> dozer, $91.76/hr. This will not affect the Purchase Order Price. <br /> 4. A 15 day extension to the Time of Completion was granted to accommodate <br /> weather delays, worker turnover, and unique techniques utilized within <br /> the project. <br /> Change to Purchase Order Price: THIS IS A NO COST CHANGE ORDER <br /> Change to Purchase Order Completion Time: <br /> The Purchase Order Time for Completion due to this Change Order will be <br /> increased by 15 calendar days. <br /> New date for completion of all work will be: September 16, 1991. <br /> RECOMMENDED BY:,/ (MLRD Project Manager) <br /> ACCEPTED BY: � - (Contractor) <br /> APPROVED BY: � C z� ��, (MLRD Program Supervisor) <br /> P ) <br />