Laserfiche WebLink
BID SCHEDULE <br /> Coal Basin Project <br /> RN-MINES-270 <br /> ITEM DESCRIPTION QTY UNIT UNIT AMOUNT <br /> PRICE <br /> 1 Mob/Demob 1 Job N/A <br /> 2 Coal Waste Pile Relocation 40 Hours <br /> and Regrading <br /> 3 Type A Channel Construction 1000 Ln Ft <br /> 4 Strip Bench Area Regrading 40 Hours <br /> and Dozer Basin Construction <br /> 5 Slope Reclamation: Hedge 1 Job N/A <br /> Brushlayer Construction <br /> Re fores to ti on <br /> 6 Rev a ge to ti on 10 Acre <br /> GRAND TOTAL <br /> This Bid Schedule Must Be Returned With Your Bid <br /> Page 1 of 1 Page <br />