My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-12_REPORT - M2002096 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2002096
>
2012-10-12_REPORT - M2002096 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:52:23 PM
Creation date
10/18/2012 7:06:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002096
IBM Index Class Name
REPORT
Doc Date
10/12/2012
From
Holcim
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 11, 2012 <br />Mr. Jim Dupler <br />Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Dear Mr. Dupler: <br />Thank you, <br />J Lamanna <br />Quarry Manager <br />Holcim (US) Portland Plant <br />t ' H o k rn <br />Holcim (US) Inc <br />3500 State Hwy 120 <br />Florence, CO 81226 <br />Phone 719- 784 -6325 <br />Fax. 719 -784 -3470 <br />www.holcim com /us <br />RECEIVED <br />OCT 1 22012 <br />Division of Reclamation, <br />Mining & Safety <br />Subject: Holcim (US) Inc., Portland Limestone Quarry (Permit # M- 2002 -096) 2012 <br />Annual Report <br />Attached please find the 2012 annual report and map for the Rock Pit #1 Quarry, mine <br />permit M- 2002 -096. Enclosed with the report is a check for $791.00, to cover the annual <br />fees from October 15, 2011 through October 15, 2012. <br />After reviewing the requirements outlined in question 2, rule 3.1.12(2) it was determined <br />that some additional work is required to fully define the boundary requirements as <br />outlined in that rule. Therefore, in the coming weeks Holcim survey personnel will <br />address this requirement to ensure compliance with the division standards. <br />Last years reclamation activities included removing the product weight scale, office trailor, <br />and some associated dimension stone product. The 0.05 acres outlined in the report <br />includes this work. <br />This year, Holcim will conduct stabilization work around the topsoil stockpile that will <br />include grading and seeding of the stockpile to prevent erosion. <br />Should you have any questions or need any additional information please feel free to <br />contact me at (719) 784 -1209. <br />
The URL can be used to link to this page
Your browser does not support the video tag.