My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (141)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (141)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 7:33:39 AM
Creation date
10/17/2012 11:26:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Violations, 1993 <br /> C-93-096 Waldron 6/17/93 Failure to maintain a stabilized 120(2)(v)(111) The diversion above the old refuse 1. Reestablish upper 1. 7/20/93 Proposed penalty. <br /> diversion channel to pass safely the 4.09.2(7) disposal pile where it drains off to diversion to safely drain $1,050. <br /> runoff from a 100 year, 24-hour the west. water away from the pile. Extension <br /> precipitation event, failure to divert 4.09.1(14) This shall be reestablished to 8/30/93 Note: an extension <br /> runoff from the fill surface into Sutey pile diversion (west) along toe or constructed via the re. to 7130193 written <br /> stabilized channel. of pile; approved plan. submittal for"submittal of as- <br /> of P.E. built certifications of <br /> Failure to assure the foundation & Clean water diversion above pile. 2. cert. 100-year diversions <br /> abutment of refuse pile is stable. a) Submit a revision with 2. around old refuse <br /> Old refuse pile foundation where plans for reinforcing the toe a) 8/25/93 pile..." <br /> Dutch Creek is undercutting the of the slope being undercut b) 15 <br /> slope beneath the pile. by Dutch Creek and moving days after Extended to August <br /> the creek away from the approval. 30 —i <br /> slope, including any `- <br /> required approvals from the a <br /> Army Corps of Engineers; <br /> ANP-- b) Implement the approval <br /> plans within 30 days of <br /> approval by DMG. <br /> C-93-097 Waldron 6/17/93 Failure to maintain a temporary or 120(2)0)(1)(C), 121(2)(b), Lower portal at#5 mine Replace block wall and re- 9/16/93 Proposed penalty: <br /> permanent seal on a portal at the#5 121(2)(i)(1)(C), 121(II)(C) construct according to $1,050 <br /> mine, specifically the block wall seal 4.07.2, 4.07.3 MSHA standards. This <br /> is not draining properly and grout has should include appropriately <br /> failed and allowed water to seep sized portal drain to prevent <br /> through the wall. water impounding behind <br /> the wall. <br /> C-93-098 *?outten 6/17/93 Failure to design sediment control and 34-33-120(2)0)(II) & -2 culverts at#5 Mine pad-" Submit designs for the 8/13/93' Proposed penalty. <br /> diversion structures prior to 1221(2)(i)(II) above-cited structures or $1,050 <br /> construction. - Pre-law BTA impoundments at remove the structures. <br /> 4.05.9(2), 4.05.6(3) toes of outslopes of upper mine <br /> portals; <br /> - fresh water ponds at yard area. <br /> C-93-099 houtten 6/17/93 Failure to re-grade rill &gullies and to 4.14.6 Old refuse pile- reclaimed portions. Identify and repair gullies 7/17/93 Terminated. <br /> follow the approved rill &gully plan. 34-33-12 (2)(d) according to the approved Proposed penalty. <br /> rill &gully plan in the permit $550 <br /> Gullies filled 718193 <br /> 3 <br /> 08/25/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.