My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (140)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (140)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 7:32:18 AM
Creation date
10/17/2012 11:26:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�MENT of Ty 1�ENT�j <br /> "_v.....,_ FZM U. S. DEPT. OF THE INTERIOR <br /> t ''•a: 9 <br /> OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT o <br /> �4A3-,ga9 Mine-Site Evaluation Inspection Report .�F�Sm <br /> 10. Type <br /> 1. Permittee/Person 9. Permit Number a.Permit b.RA <br /> MID CONTINENT RESOURCES C-81-017 NP R <br /> 2. Address 11. Inspection Date 12. Inspection Type 13. Joint Inspection <br /> PO BOX 1298 07/23/93 FF �N YIN <br /> MM - DD - YY <br /> 3. City 4. State 14. Permit Status 15. Site Status 16. Facility Type <br /> GLENWOOD SPR. CO BF FP I B <br /> 5. Zip Code 6. Phone Number 17. OS Office# 18. RSI# 19. Land Code <br /> 81602 -�� 020 FS <br /> 7. Operator if Different than Permittee 20. M.S.H.A.ID# 21. State Code 22. County Code <br /> PITKIN IRON CO 05-00469 08 097 <br /> 8. Mine Name 23. AVS Permittee Entity ID Number <br /> COAL BASIN 091955 <br /> 24. Performance Standard Categories <br /> Codes: 1=Com licence 2=Noncom licence 3=Not PlannecL 4=Not S =Noncom liance Identified Elsewhere <br /> A. Administrative D. Backfilling&Grading H._Subsidence Control Plan <br /> I.-Mining within Valid Permit 1_-Exposed Openings I. Roads <br /> 2.-Mining within Bonded Area 2. Contemporaneous Reclamation 1. Road Construction <br /> 3.-Terms&Conditions of Permit 3.__-Approximate Original Contour 2.-Certification <br /> 4.-Liability Insurance 4._Highwall Elimination 3. Drainage <br /> 5._Ownership and Control 5._Steep Slopes(includes downslope) 4. Surfacing and Maintenance <br /> 6._Temporary Cessation 6._Handling of Acid&Toxic Materials 5.=Reclamation <br /> B. Hydrologic Balance 7•_Stabilization(rills and gullies) <br /> 1. 1 Drainage Control E. Excess Spoil Disposal J. Signs&Markers <br /> 2.-Inspections&Certifications 1. Placement 1. Signs <br /> 3. Siltation Structures 2. Drainage Control 2.-Markers <br /> 4.-Discharge Structures 3. Surface Stabilization K. Distance Prohibitions <br /> 5._Diversions 4._Inspections&Certifications <br /> 6._Effluent Limits L. Revegetation <br /> 7._Ground Water Monitoring F. Coal Mine Waste 1._Vegetative Cover <br /> 8._Surface Water Monitoring (Refuse Piles/Impoundments) 2._Timing <br /> iming <br /> 9._Drainage--Acid-Toxic Materials l._Drainage Control <br /> 10._Impoundments 2. Surface Stabilization M._Postmining Land Use <br /> 11. 2 Stream Buffer Zones 3. Placement <br /> 4._Inspections and Certifications N. Other <br /> C. Topsoil& Subsoil 5._Impounding Structures <br /> I.-Removal G. Use Of Explosives -1) <br /> 2.-Substitute Materials I.-Blaster Certification <br /> 3._Storage and Protection 2. Distance Prohibitions -2) <br /> 4.-Redistribution 3.-Blast Survey/Schedule 3 <br /> 4._Warnings&Records - ) <br /> 5. Control of Adverse Effects <br /> 25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br /> a.Date of Last a.Total <br /> State Complete 03/30/93 1.0 a.Permit Review 333.0 bonded <br /> Inspection 0.0 a,permitted <br /> Frequency for previous 4 Calendar Qtrs. b.Phase I <br /> b.Number of Number of 1.0 b.Inspection Time 0.0 released <br /> required ❑ complete ❑ 333.0 b.Disturbed <br /> complete Q inspections Q c.Phase II (Estimated) <br /> inspections conducted 7•Q 0.0 <br /> c.Number of Number of <br /> c.Travel Time released <br /> required <br /> d 0 partial <br /> partial 4.0 d.Report Writing 0.0 d'Phase� Page 1 of <br /> nspections conducted epo 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.