My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (139)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (139)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 7:29:32 AM
Creation date
10/17/2012 11:26:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
operations at the Mid-Continent site. However, it is inaccurate <br /> to make the blanket assumption that reclamation is not being <br /> conducted at the site. The first steps in the reclamation <br /> process are progressing at the mine. Structural demolition is <br /> being conducted, with the approval of the United States <br /> Bankruptcy court, as a first step in the reclamation progression. <br /> This is a vital first step because the ability of the permittee <br /> to perform the remaining reclamation obligations is directly <br /> dependent upon the infusion of cash to the bankrupt estate. The <br /> capital which will be utilized by the company will be provided by <br /> sales from the salvage operations. As each mine entry is cleared <br /> of materials and backfilled, reclamation of the entry area and <br /> the associated road will be completed. Although this process may <br /> be slow, reclamation is, in fact progressing as contemporaneously <br /> as practicable. <br /> The practicability of achieving site reclamation must also be <br /> viewed in terms of the realities of the United States Bankruptcy <br /> code. In a very tangible way, the assets of the operator have <br /> been frozen by the bankruptcy court. The operator cannot expend <br /> monies for any purpose, including reclamation, without the <br /> consent of the court. Although the State has been successful in <br /> ensuring that some money from equipment sales was utilized for <br /> maintenance and limited reclamation work, the bulk of reclamation <br /> work at the site, excepting structural demolition and equipment <br /> salvage is currently precluded by court order by virtue of the <br /> fact that the permittee is disallowed from expending monies until <br /> the bankruptcy proceeding is concluded. As you are aware, the <br /> State of Colorado has been continuously involved in the <br /> bankruptcy proceeding. The Court is currently developing a <br /> liquidation plan which will address funding of the reclamation <br /> plan for this mine. The State attorney's have been active in <br /> trying to secure funds so that reclamation of the entire site may <br /> be comprehensively addressed. <br /> Issue four of the TDN also is one of contemporaneous reclamation. <br /> Issue four cites a failure to reclaim portions of an old stream <br /> crossing on the NO. 5 mine road. For the reasons stated above, <br /> it has not been practicable to contemporaneously reclaim this <br /> disturbance to date. However, pending the outcome of the final <br /> bankruptcy order, DMG has been informed by Mid-Continent that the <br /> Number 5 Mine area will be reclaimed this season. Reclamation of <br /> the stream crossing will be accomplished in conjunction with <br /> reclamation of the pad areas as the reclamation project proceeds <br /> down the road away from the entry area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.